Laserfiche WebLink
,jw Tanknology3ECEIVEp <br /> Executive Summary `SAN 0 ,j 2018 <br /> Interstate Oil STOCKTON <br /> 4900 E.Mariposa Road ENVPF; "EtgTAL <br /> �f�'A��.1"�F� <br /> Stockton, CA 95215 DEPARTMENT <br /> The are some of the observation that were observed during the the inspection. <br /> • Tank 1 :Are the Tanks Grounded And1Or Bonded Properly? - Ground tanks per NFPA 780 or other accepted <br /> industry standard. <br /> • Tank 1 :Emergency Contact Numbers Posted As Required? -Emergency plan is required and should include <br /> posting of emergency contact numbers. <br /> • Tank 1 :Filling Procedures Posted At Fill As Required? -Install signage at the fill point to document filling <br /> procedures. <br /> • Tank 1 :Fire Valve Installed? -Install a fire valve on product transfer piping through which liquid could flow through <br /> gravity. <br /> • Tank 1 : Tank Capacity And Tank ID Posted On The Tank As Required? - Clearly label tank with capacity and <br /> ID. <br /> • Tank 1 : Tank Overfill Protection Type - Should have written overfill plan on site <br />