Laserfiche WebLink
V <br /> CALM Pete Wilson <br /> Governor <br /> State Water <br /> Resources <br /> Control Board <br /> Division of APR 1 0 1998- <br /> Clean Water Leo M. Zuber <br /> Programs Ripon Unified School District <br /> 304 Acacia Ave N <br /> Mailing Address: Rj on, CA 95366 <br /> P.O.Box 944212 p <br /> Sacramento,CA <br /> 94244-2120 UNDERGROUND STORAGE TANK CLEANUP FUND,CLAIM NO. 12234, FOR SITE <br /> 2014 T Street, ADDRESS: 304 ACACIA AVE N, RIPON <br /> Suite 130 <br /> Sacramento,CA The State Water Resources Control Board State Board is able to issue, pursuant to applicable <br /> 9ss14 ( ) pP <br /> (916)2274307 regulations,the enclosed Letter of Commitment(LOC) in an amount not to exceed $20,000. <br /> FAX(916)2274530 This LOC is based upon our review of the corrective action costs you reported to have incurred <br /> World Wide Web to date. The LOC may be modified by the State Board. <br /> http://www.swrcb.ca, <br /> gov/--cwphome/ It is very important that you read the terms and conditions listed in the enclosed LOC. Claims <br /> fvndhome.htm <br /> filed with the Underground Storage Tank Cleanup Fund far exceed the funding available and it is <br /> very important that you make use of the funding that has been committed to your cleanup in a <br /> timely manner. <br /> Cgn5equently,if you do not submit your first reimbursement request for corrective action <br /> costs which you have incurred within ninety(90)calendar days_fro-m thedateof this letter, <br /> our funds will automatically be deobligated. Once deobligated,any future funds for this <br /> site will be obligated subject to availability of funds at such time when we receive your <br /> reimbursement request. <br /> You are reminded that you must comply with all regulatory agency time schedules and <br /> requirements and you must obtain three bids for any required corrective action. Only corrective <br /> action costs required by the regulatory agency to protect human health, safety and the <br /> environment can be claimed for reimbursement. Unless waived in writing,you are required to <br /> obtain preapproval of costs for all future corrective action work(form enclosed). If you <br /> have any questions on obtaining preapproval of your costs or the three bid requirement, please <br /> call James DiGiorgio, our Technical Reviewer assigned to claims in your Region, at(916) 227- <br /> 7748. Failure to obtain preapproval of your future costs may result in the costs not being <br /> reimbursed. <br /> The following documents needed to submit your reimbursement request are enclosed: <br /> • "Reimbursement Request Instructions" package. Retain this package for future <br /> reimbursement requests. These instructions must be followed when seeking <br /> reimbursement for corrective action costs incurred after January 1, 1988. Included in the <br /> instruction package are samples of completed reimbursement request forms and <br /> spreadsheets. <br /> Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> ensure proper allocation and efficient use for the benefit ofpre end future generations. <br />