My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
304
>
3500 - Local Oversight Program
>
PR0543359
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 10:18:17 AM
Creation date
10/22/2018 9:49:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543359
PE
3528
FACILITY_ID
FA0000733
FACILITY_NAME
RIPON USD-MAIN KITCHEN
STREET_NUMBER
304
Direction
N
STREET_NAME
ACACIA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904005
CURRENT_STATUS
02
SITE_LOCATION
304 N ACACIA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> ATC SITE SAFETY PLAN <br /> x. la <br /> I� <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> �t <br /> As a minimum Level D protection is required on all ATC worksites. Level D includes: <br /> k <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project identifyadditional <br /> protective garments as required, include the <br /> C conditions under which the level of PPE would be modified for each task. <br /> Tasks} Condition: Personnel Garrrierrt{sj <br /> i Working Near Vehicle Orange Vests <br /> 1 >20 ppm for 5 minutes 1/2 Face Respirator ; <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> �i <br /> 3i <br /> SITE CONTROL AND COMMUNICATIONS Ir <br /> i <br /> The buddy system must be used on all ATC hazardous wastesites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Orange cones or,barricades and caution tape will be <br /> used to mark off work zone where traffic is present. <br /> I� <br /> a <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE..; <br /> i <br /> h <br /> t <br /> .i <br /> I� <br /> 3� <br /> 31 <br /> i <br /> ii <br /> PAGE 10 i+ <br /> I <br /> �3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.