My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
304
>
3500 - Local Oversight Program
>
PR0543359
>
ARCHIVED REPORTS XR0000007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 11:13:50 AM
Creation date
10/22/2018 9:56:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000007
FileName_PostFix
XR0000007
RECORD_ID
PR0543359
PE
3528
FACILITY_ID
FA0000733
FACILITY_NAME
RIPON USD-MAIN KITCHEN
STREET_NUMBER
304
Direction
N
STREET_NAME
ACACIA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904005
CURRENT_STATUS
02
SITE_LOCATION
304 N ACACIA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Cvv0 <br /> T( <br /> A S S 0 C I A 7 E S I N C <br /> equipment and treatment compound, and operation and maintenance of the system The <br /> cost of this alternative is estimated to be between$120,000 and $180,000 <br /> ♦ Criterion 5 <br /> This alternative should effectively remediate subsurface contaminants to acceptable <br />' regulatory levels within 18 months of implementation <br /> ♦ Criterion 6 <br /> The long term effectiveness would be good depending upon the degree of contaminant <br /> removal Groundwater would be monitored periodically until soil and groundwater is <br /> remediated to ensure that petroleum hydrocarbons are biodegrading <br /> I <br /> ♦ Criterion 7 <br /> ' This alternative has some minor implementability problems due to the necessity of a pilot <br /> test and the time involved in obtaining permits from the San Joaquin Valley Air Pollution <br /> Control District (APCD) for the vapor extraction system Permitting could take as much as <br /> I180 days depending upon APCD work load,but is typically completed 1n 60 to 90 days <br /> ♦ Critei ion 8 <br /> Impact to the businesses during installation and other site activities will be moderate This <br /> method has been shown to be effective in similar soil types and regulatory acceptance is <br /> expected <br /> ' 9.0 RECOMMENDATIONS <br /> Based on the soil and groundwater data compiled and included in this technical report, ATC <br /> Associates recommends passive remediation of the petroleum hydrocarbons beneath the site <br /> ATC Associates recommends performing quarterly monitoring events and analyzing <br /> groundwater samples for geophysical parameters in addition to the existing monitoring <br /> parameters The geophysical parameters should include dissolved oxygen, carbon dioxide, <br /> ' sulfate, alkalinity, ferrous iron, nitrate, and oxidation reduction potential Once four quarters of <br /> monitoring at the site indicate that natural biodegradation is occurring, ATC will recommend site <br /> closure from the appropriate regulatory agencies <br /> ' Upon regulatory concurrence of the preferred remedial action method, ATC Associates will <br /> begin analyzing groundwater samples collected during quarterly monitoring events for <br /> geophysical parameters <br /> w 1130991reportslsumwe11 doc 13 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.