Laserfiche WebLink
AUG 0 6 2004 FOOTHILL <br /> ENGINEERING <br /> _ ' PNVI,A(jIvMENT HEALT 2793 PADDY CREEK LANE LODI, CA 95240 <br /> PERMIT/SERVICES PH. (209) 368-9381 FAX (2o9) 367-1163 <br /> - I <br /> August 5, 2004 <br /> Diana Maragos <br /> P.O. Box 247 ' <br /> Galt, Ca 95632-8854 <br /> Subject: Sun West Liquors, 2449 W. Kettleman Lane Lodi, CA LOP Site code: 503357 <br /> Global ID T0607700812 <br /> Dear Diana: <br /> On July 13, 2004, Foothill Engineering recommend d in the Quarterly Monitoring Report that San <br /> Joaquin County Public Health Services Environmental Health Department issue a"No Further Action <br /> Required"for this site.This morning I talked with Mr.Harlin Knoll of that lead agency by phone and he <br /> concurred with our recommendation that"No Further Action" is required on this site. <br /> Mr. Knoll stated that it is typical for the agency to require two quarters of groundwater sampling with <br /> results similar to the last sampling results before h will issue a letter stating "No Further Action <br /> Required." This requirement is a standard procedure with all lead agencies governing rem.ediated <br /> groundwater sites and should not be a concern. Foothill believes further testing will confirm that the <br /> groundwater has been remediated to standards accept ble to the lead agency. <br /> After the lead agency issues a letter of"No Further Action Required," all installed remediation and <br /> monitoring facilities must be removed or closed in a manner acceptable to that agency.This will require <br /> that all the monitoring wells and the extraction wells on the site be pressure grouted and the top three feet <br /> of those wells removed.This work will require that a drill rig be moved onto the site to do the work and <br /> that there will be some disruption to the traffic flowaround the site. This disruption is short compared <br /> to past disruptions, and the property owner should be happy that there is an end in sight. <br /> If you have any questions concerning the site closur ,procedure; pease contact Ery Rifenburg of this <br /> office. not <br /> Respectfully submitted, <br /> Tib% <br /> 0 <br /> 13 <br /> . roup,Mr.Harlin Knoll of a . gional <br /> Water Quality Control Board Appn val exhNIdse'o1 A M dObw <br /> herec n and dom not aWho**or oppmo oVor <br /> devia ior, fr*rn -Anifirements of state laws of RXW Offtsnces. <br /> I { 1 <br />