My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
3500 - Local Oversight Program
>
PR0543839
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 11:50:27 AM
Creation date
10/22/2018 10:30:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543839
PE
3528
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RTC' <br />S SO C I ATE S I N C. <br />+ Radius of influence of groundwater extra <br />• Groundwater drawdown; <br />• Hydrogeologic properties of the aquifer; <br />• Mass extraction rate of groundwater. <br />The scope of work for the pilot test consisted of extra, <br />EW -1 for approximately 6.5 hours, and monitoring the <br />well EW -1 and observation wells GMX-1 and MW -2 th <br />3.1 <br />n <br />of groundwater from monitoring well <br />ges in groundwater level in extraction <br />L MW -4. <br />The aquifer test was conducted on January 29, 2002 over an approximate 6.5 -hour period by <br />extracting groundwater at a generally constant rate frorr well EW -1. The test was performed to <br />determine the aquifer properties and the radius of influer ce for groundwater pumping. <br />Prior to initiating groundwater pumping, water lev( <br />Measurements were collected manually using water lev( <br />one-hundredth of a foot (0.01 feet). Depth to water me, <br />test are shown on Table 1. Prior to initiating the test, Al <br />the extraction well EW -1 and observation wells GMX1 <br />the depth to water in the wells throughout the test. <br />The extracted groundwater was discharged into a 6,5( <br />approximately 80 feet north of extraction well EW -1. <br />Appendix D. <br />3_2 Analysis of Groundwater Pumping Test Data <br />The constant discharge aquifer test is the most useful m <br />hydraulic conductivity (K), transmissivity (T), and s <br />layer. The groundwater pumping rate during the p <br />averaged approximately 13.54 gallons per minute (g <br />approximately 5,280 gallons of groundwater extracted <br />analyzed using AQTESOLV' groundwater modeling; <br />3,3 <br />The aquifer parameters transniissivity and storage coeffc <br />software. Drawdown data were used in solving for 1 <br />observation wells, GMX1, MW -2, MW -3, and MW-� <br />elevations measured during the test were recorded by <br />-` Appendix E with the AQTESOLV' input data. The <br />average of 11 feet, based on approximate length of the w, <br />w:1259571reportslpumptest.doc 3 <br />s were measured in each site well. <br />probes capable of measuring depths to <br />urements at the beginning of the pump <br />placed dedicated water level probes in <br />MW -2, MW -3, and MW -4 to measure <br />polyethylene Baker Tank located <br />test field notes are contained in <br />J to determine the aquifer parameters of <br />;e coefficient (S) in the water -bearing <br />test, as measured by the flow meter, <br />which over a 6.5 -hour period yields <br />a well EW -1. The collected data were <br />nt were calculated using AQTESOLV' <br />aquifer parameters. Data from four <br />were used for analysis. Groundwater <br />,ater level probes and are contained in <br />4uifer thickness was assumed to be an <br />,r column in the well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.