Laserfiche WebLink
0VIV2000 02:26 2093671163 <br />"ENVIRONMENTAL HEALTH DIVISIO <br />304 E. Weber Ave. Third Floor .� <br />R O. Box 388, S�oc don CA 95201-0388 <br />Approved <br />Denied <br />Conditianis <br />by. <br />. APR 19 2000 <br />RONMENTAL HEAL <br />?ERTr1IT/SErMCES <br />Harlin Knoll <br />San Joaquin County Public Health Services <br />Environmental Health Division <br />P. 4. Box 388 <br />Stockton, CA 95201 <br />Subject: Sun West Liquors, 2449 W. Kettleman. Latae, <br />Dear Sir': <br />Please find below a work plan ;for conducting an <br />Proposed Water Tmatment Study <br />WORK FLAN FOR <br />History <br />On 7/1011998 Thorpe Oil ofLodl, California removed tl <br />property. Soi i samples firataa. underneath the USTs and d <br />occurred during the life of the gasoline sales operation <br />determine the vertical and horizontal extent ofthe gaso <br />A listing of the results of analysis of ft soil samples i; <br />ENGINEERING PAGE 01 <br />r) <br />FooTHIL 11, <br />ENGTNEIERR-JIG <br />2793 PAE)DY CREEK LANE LOCI. CA 95240 <br />rza a sc i. 3a� SAX f2M 367-1163 <br />April 12, 2000 <br />WlApril 19, 2000 Addendum <br />, CA LOP Site cede: 503357 <br />well pump test for Sun West Liquors and <br />WELL PU1rW TEST <br />three gasoline USTs.ftm the Sun west Liquor <br />dispenser piping indicated that some leaks had <br />Foothill Engineering did a site investigation to <br />.ne contamination on 8/13/1998 and 8/2111998, <br />attached. <br />Geornatri,x installed the monitoring well GMX1 at a I ion +/-25 feet south ofthe UST excavation and <br />sampled first groundwate7r. That analysis is attached. eomatrix also made three soil borings (GS91, <br />01342, and 000) with both soil samples and groundwater samples extracted (see attached map for <br />location). All samples on GB#1, GB#2, and GB#3 were non -detect for all compounds analyzed (see <br />attached recaps of data). <br />The work plan of 5/24199 called for the installation of soil borings to be located on the Sun West <br />Liquor property and the possible installation of a fourth it boring on the south side ofK.ettleman Lane. <br />Soil samples w-cre to be extracted at predeterm;ioed dept is for laboratory anai!ysls. A monitoring well to <br />sample ground water was to be constructed in each ofthe soil boxings. This work plan was completed on <br />6125/99. <br />The first gmu ndwater monitoring event occurred on 7 <br />of the second event which occurred on 10148/99. The <br />The developer of the property has notified this autb <br />building for site in the next 75 days. As a result of <br />Brothers (the responsible party, aka. Sun West Ligtu <br />reclamation atad cleanup of the property. <br />i and the following is a report of the Ch -Alas <br />event was on 2/17/2004. <br />that be intends to start construction on a n&w <br />s proposed construction activity, the Anagnvs <br />I directed Foothill engineering to proceed with <br />