Laserfiche WebLink
04/1912006 02:26 2093671163 FO THILL ENC31NEERING PAGE 04 <br />ADDENDUM TU WORK PLAN (Aprij a19, 2000) <br />As per your request the following addendum informaâ–º on is'added to this work plan: <br />1. The extrmion well is to be drilled and constructed penetrate five feet in to the impervious silts or <br />clays below the aquifer. <br />I The extraction well PVC casing screened section <br />3. T- ho extraction well filter shall be #3 sand. <br />4. All groundwater pumped from the extraction well is <br />ftratnimmt or disposal. <br />4 <br />have 0.024 slots. <br />be contained in teak proof storage on site for <br />