Laserfiche WebLink
I <br />Harlin Knoll <br />San Joaquin County Public Health Services <br />Environmental Health Division <br />P. O. Box 388 <br />Stockton, CA 95201 <br />Subject: Sun West Liquors, 2449 W. Kettleman Lane, <br />Dear Sir: <br />Foo,,T 311E .0 f7; <br />ENCH ' a .,: ERING 4 `0,11 <br />2793 PADDY CREED LE NODI, <br />X `'CA 95240 <br />PH. (209) 368-9381 FAX (20§) 367-1 163 <br />t., /,' <br />April 12, 2000 <br />, CA LOP Site code: 503357 <br />Please find below a work pian for conducting an extrac ion well pump test for Sun West Liquors and <br />Proposed Water Treatment Study <br />WORK PLAN FOR EXTRACTI <br />History <br />On 7/10/1998 Thorpe Oil of Lodi, California removed th <br />property. Soil samples from underneath the USTs and th <br />occurred during the life of the gasoline sales operation. <br />determine the vertical and horizontal extent of the gasol <br />A listing of the results of analysis of the soil samples is <br />WELL PUMP TEST <br />three gasoline USTs from the Sun West Liquor <br />dispenser piping indicated that some leaks had <br />'oothill Engineering did a site investigation to <br />Ee contamination on 8/13/1998 and 8/21/1998: <br />Geomatrix installed the monitoring well GMX 1 at a loca ion +/-25 feet south of the UST excavation and <br />sampled first groundwater. That analysis is attached. Gcomatrix also made three soil borings (GB#1, <br />GB42, and GB#3) with both soil samples and groundwater samples extracted (see attached map for <br />location). All samples on GB#1, GB#2, and GB#3 were non -detect for all compounds analyzed (see <br />attached recaps of data). <br />The work plan of 5/24/99 called for the installation of t <br />Liquor property and the possible installation of a fourth <br />Soil samples were to be extracted at predetermined dept <br />sample ground water was to be constructed in each of th, <br />6/25/99. <br />ree soil borings to be located on the Sun West <br />Dil boring on the south side of Kettleman Lane. <br />s for laboratory analysis. A monitoring well to <br />soil borings. This work plan was completed on <br />The first groundwater monitoring event occurred on 7/1 /99 and the following is a report of the finding <br />of the second event which occurred on 10/08199. The third event was on 2117/2000. <br />The developer of the property has notified this author <br />building for site in the next 75 days. As a result of thi <br />Brothers (the responsible party, aka. Sun West Liquors) <br />reclamation and cleanup of the property. <br />1 <br />:hat he intends to start construction on a new <br />proposed construction activity, the Anagnos <br />directed Foothill engineering to proceed with <br />