My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
3500 - Local Oversight Program
>
PR0543839
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 11:50:27 AM
Creation date
10/22/2018 10:30:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543839
PE
3528
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />z <br />C <br />� I n <br />between '30 and 45 days of the pump and treat operationwill be required. <br />Proposed Groundwater Cleanup Levels <br />Benzene to less than 5 ug/L TPHg to less than0 mg/L <br />MTBE to less than 1 ug/L i. <br />Summary <br />The only groundwater remediation system that will meet the requirements to remove MTBE is an <br />Activated Carbon Filter system. Activated Carbon filtration was successful to non detect levels for all <br />organic compounds during the ATC pump test. <br />A total recharge replacement of -the groundwater in the c ritaminated aquifer is about 507,000 gallons_ <br />At a 12 gpm pumping and filter rate, 29 days would be required to remove the contaminated groundwater <br />at 1.00% efficiency. The last monitoring event indicated that only MWO is contaminated with MTBE <br />and only GMX-1 is contaminated with Benzene. Mv&4 was not contaminated. If qualitites and <br />assumptions hold as estimated, the project should be cotppleted in 30 to 45 days. <br />Please approve this work plan at your earliest conveni, <br />timely manner. If you have any questions on the work pli <br />Respectfully submitted, <br />4 <br />[ce, so that the work make be completed in d <br />please call Ervin Rifenburg at 2091368-9381. <br />
The URL can be used to link to this page
Your browser does not support the video tag.