Laserfiche WebLink
standards of the industry(see Groundwater Field Report by Del-Tech Geotechnical Services,attached). <br /> Purge rates were 0.1 gal/min. Groundwater samples were extracted from each monitoring well using the <br /> Watera Inertia Pump technique. Samples were transported on ice for delivery under chain of custody to <br /> GeoAanalytical Laboratories for analysis. <br /> Sample Analysis <br /> Water samples were analyzed by EPA methods 8021 B for BTEX, 5030/Luft for TPHg, and EPA 8260B <br /> for Oxygenates.Results of all sample analyses are attached in the original laboratory form and in recap form. <br /> Findings From Water Sample Analysis <br /> The samples from monitoring well MW-3 and GMX-1 both produced detectable amounts ofthe Oxygenate <br /> MTBE. Samples from monitoring well MW-2 had levels ofBTEX similar to past history. GMX-1 produced <br /> samples with highest levels of BTEX for the history ofthe site.Monitoring well MW-3 and MW-4 were non- <br /> detect for TPHg, as were the results of the last event. <br /> The groundwater surface has raised about+/-T from the last event(see Del-Tech Field Report,enclosed). <br /> The groundwater hydraulic gradient is to the south at a slope of S=0.001. The hydraulic gradient slope <br /> dropped from S=0.003 on 9/18/01 to S=0.001 for this event. <br /> Conclusions <br /> MTBE levels remain at near that ofthe last sampling event and occur in only monitoring wells GMX-I and <br /> MW-3.Monitoring well GMX-1 is the only monitoring well that exceeds proposed allowable concentrations <br /> for MTBE of 14 ppb. Groundwater elevations have risen from the last event about two feet and are about <br /> 1.5'lower than the same quarter last year. The water sample analysis for monitoring well GMX-1 and MW- <br /> 2 continue to produce low levels of TPHg.Monitoring well MW-2 has levels of Ethyl benzene and Toluene <br /> slightly above EPA limits for drinking water. <br /> Recommendations <br /> Quarterly groundwater monitoring should continue as in the past. The well for the pump test has been <br /> installed,and the pump test should be run as soon as possible.Recommendations for groundwater treatment <br /> will be made after the results of the pump test are known. <br /> Please contact Ervin Rifenburg of this office(209/368-9381)ifany questions arise concerning this Report. <br /> Respectfully submitted, <br /> It 15$,b <br /> Tootl#U30gi %AFEq Ey <br /> 147 <br /> i b r �. <br /> cc: Diana Mara r Sun West Liquors <br /> cc: W. T. Mitchell <br /> 2 <br />