My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
4110
>
3500 - Local Oversight Program
>
PR0543841
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 3:34:07 PM
Creation date
10/22/2018 2:40:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543841
PE
3528
FACILITY_ID
FA0005509
FACILITY_NAME
ENCOR INC
STREET_NUMBER
4110
STREET_NAME
INDUSTRIAL
STREET_TYPE
WAY
City
TRACY
Zip
953041611
APN
21221011
CURRENT_STATUS
02
SITE_LOCATION
4110 INDUSTRIAL WAY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.� -Lr-1r lU14 aRUvr ILL NU ..)1U b�P5 rb6r Npr 2e ,95 12 = 19 P .05 <br /> Ms. Mast'Meays <br /> Sart Joaquin County <br /> December G, 1994 <br /> Page 4 <br /> the tank removal and later remedial activities are presented in Table 3. The analytical <br /> results for sampling conducted during,the well construction and earlier hydrrpunrh <br /> sampling are tabulated on Table l of the well instsllation report presented in Attachment <br /> D. The analytical results for the soil stockpile sampling conducted during the tank <br /> removal activities are tabulated on Table 4. <br /> S, "Vertieal and lateral concentration iCuiltoum of rurttanriknants found initially, <br /> and those remaining in soil and groundwater, both on and oirsite" <br /> As indicated by the analytical results pncsentcd in Tables l and 3, subsequent to the <br /> remedial activities conducted immediately after the tank removal(sm item 7), no <br /> contaminants were detected in the soil nor in the groundwater monitoring conducted in <br /> the last three quarters. Therefore, this ivrormation is not applicable to this site. <br /> G. "Mass balance calculation orthe subsance treated versus that ronaitxing" <br /> As indicated by the analytical results presented in Tables l and 3, no conteminwits were <br /> detected in soil samples collected subsequent to overexcavating the tank pit nor in <br /> groundwater monitoring conducted in the last three quaners_ Therefore, this requirement <br /> is not applicable to this site sincc the data indicates that there are no uintamironts <br /> remaining. <br /> 7. "Teclunology used to clean the site" <br /> During the initial tank removal activities conducted in June 1992, a total of approximately <br /> 160 tons of hydrocarbon-aff tcxl sail was excavated, removed fYom the site, and disposed <br /> of Approximately 1,500 gallons ofgmundwater were also evacuated and reinovcd from <br /> the site. Within the next nearly two years, as indicated by the groundwater Mnitaring <br /> data colleaed over the last three quarters, any remaining trade levels of petroleum <br /> hydrocad5ons in the groundwater were degraded by naturally oacurring biological <br /> activities. <br /> 8. "lone of influence calculato for tht subsurrace remediation system and the <br /> zone of capture atlained for the soil and givandwater reirediation system" <br /> No groundwater remediation system wa%constructed at this site. <br /> 9. "Reasons why "background" was/is unattainable" <br /> No contaminants of concern were detected during monitoring conducted over the last <br /> three quarters "Background"was Attained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.