Laserfiche WebLink
REPORT DATE June 18, - 1992 PROJECT MGR: A. Morrill <br /> EXAMINATION NO. : 692-3121.2 PAGE 5 of 10 <br /> CLIENT : Statewide Excavation - <br /> PROJECT NAME : McKesson's Distributing <br /> i <br /> TL # : 392-0001=15 <br /> DATE SAMPLED : 06-09-92 at 1440 hrs . by K. Jones <br /> DATE RECEIVED: 06-10-92 at 0805 hrs . from K. Jones <br /> DATE PREPARED: 06-10-92 <br /> DATE ANALYZED: 06-11-92 <br /> a <br /> ANALYZED BY K. Spiller, S. Singh <br /> REVIEWED BY B. Stafford <br /> SAMPLE TYPE Soil <br /> SAMPLE IDENTIFICATION: S-2 Stockpile West 1 <br /> j i I <br /> CONSTITUENT RESULT MDL METHOD <br /> (mg/kg) (mg/kg) <br /> Benzene ND 0 .5 8020 <br /> Toluene 0.6 0.5 8020 <br /> Ethylbenzene ND 0 .5 8020 <br /> Xylenes 0.8 0 .5 8020 <br /> TPH-Diesel 290 1. 0 GC/FID <br /> TRPH 1400 S 418 . 1 <br /> NOTES: <br /> Preparation (BTEX) : 5030 <br /> Preparation (TPH-Diesel) : 3540 <br /> TPH : Total Petroleum Hydrocarbons <br /> TRPH : Total Recoverable Petroleum Hydrocarbons <br /> mg/kg: milligrams per kilogram (parts per million) <br /> MDL : Method Detection Limit <br /> j ND : None Detected <br /> 0707-a"&ue4.,,PC. <br /> Fresno Modesto visaha BakerSfeld <br />