Laserfiche WebLink
I� <br /> I !, Site Contamination Workplan <br /> E Sierra-Hay Farm Credit Services <br /> page -5- <br /> 4 .0 OTHER CONSIDERATIONS <br /> ' <br /> A Health and Safety Plan has been completed and will be <br /> present on-site during all activities . All personnel, will be <br /> required to .read and sign this document. !A copy of the Health ' <br /> and Safety Plan is included in Appendix Bof this document. _ <br /> 5 . 0 INVESTIGATION RESULTS <br /> A number of documents produced from the activities outlined, <br /> in this Workplan will be incorporated into, a Problem Assessment <br /> Report (PAR) to be presented to the ,.San. Joaquin' County <br /> Environmental. Health Department. The PAR will include ( 1) a <br /> written discussion of the history and a ch11 ronology of activities <br /> conducted on site, (2) a scaled map with all pertinent buildings, <br /> i1 <br /> f existing and previous underground,itanks, related piping, and <br /> - 9k <br />` underground utilities, (3) the geological ilogs, (4) geological <br /> cross sections illustrating the subsurface: profile, (5) a <br /> presentation and interpretation of the analytical data, and (6) <br /> Il <br /> recommendations for site closure or additi3onal' investigation <br /> and/or remediation, as required. I, <br /> Res ctful1 ub itted, 'E <br /> DG ip <br /> NNAE�L BISHO <br /> J s F. ck Donald T. Bishop <br /> S f Gecglogist � Registered Geologist <br /> State of California <br /> * License #4852 <br /> ` OF <br /> �r <br /> JWl/SBFCS.SCW _ <br /> t <br /> F <br /> CONDOR <br /> i <br />