My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
472
>
2900 - Site Mitigation Program
>
PR0522667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 4:49:21 PM
Creation date
10/22/2018 4:00:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522667
PE
2950
FACILITY_ID
FA0015448
FACILITY_NAME
CROM PROPERTY
STREET_NUMBER
472
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
20013001
CURRENT_STATUS
01
SITE_LOCATION
472 N AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k4 KLEINFELDER <br /> and at varying intervals. The eight groundwater samples will be collected using a disposable or <br /> stainless steel bailer or by positive displacement through polypropylene tubing attached to a <br /> stainless steel ball valve. A disposable screened PVC casing will be placed within the pushprobe <br /> holes to filter out sediment. The PVC casing will include a 5 to 10 foot .010-0.020-inch slot <br /> screened interval, placed within the water bearing zone, prior to groundwater collection. The <br /> groundwater will be decanted into laboratory supplied bottles directly from the tubing or using <br /> pre-cleaned stainless steel bailers. <br /> Upon completion of the soil and groundwater sampling the soil borings will be grouted the same <br /> day in accordance with SJC/EHD requirements. <br /> TASK 3.0 LABORATORY ANALYSIS <br /> After collection, the soil and groundwater samples will be labeled, logged on a chain-of-custody <br /> form, and immediately stored in an iced cooler. The samples will be transported under chain-of- <br /> custody control to Kleinfelder's office and then transported by courier in a sealed container to a <br /> State Certified Laboratory to perform the requested analyses. <br /> Approximately 24 soil samples (estimate three from each of eight soil borings) and eight <br /> groundwater samples will be submitted for the following analyses. <br /> • Nitrate as N by EPA Method 300.0 <br /> • Total Kjeldahl Nitrogen (TKN) by EPA Methods <br /> • Ammonia as N by EPA Method 350.3 <br /> • Fecal Coliform by EPA Methods <br /> The samples will be analyzed on a standard 10-day working turn-around time (TAT). Expedited <br /> TATs can be provided at additional costs. <br /> TASK 4.0 REPORTING <br /> Upon completion of soil and groundwater sampling, and receipt and review of analytical results, <br /> the following items will be included in our Phase II ESA report for client and agency review: <br /> • A description of field activities, observations, and protocols; <br /> • Lithologic logs; <br /> • Results of the soil sample analysis with copies of certified analytical laboratory <br /> results with chain-of-custody documentation; <br /> • A graphical representation of soil sampling locations; <br /> • Description and documentation of QA/QC procedures employed for field and <br /> laboratory work; and <br /> • An assessment of the results, with conclusions and recommendations. <br /> 02001 PROP.ENV/ST04P222/DGD:ss Page 6 of 10 <br /> Copyright 2004,Kleinfelder,Inc. May 26,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.