Laserfiche WebLink
JU KLEINFELDER <br /> ANTICIPATED PROJECT SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> Approximate Task <br /> Timeline <br /> Week 0 Formal authorization provided by the client <br /> Week I Begin Phase I ESA Tasks/Permitting/Schedule Drilling Subcontractor <br /> Week 2-3 Limited Soil Assessment Chemical Analysis' <br /> Week 4 Phase I ESA/Limited Soil Assessment Report Preparation <br /> Week S Phase I ESA/Limited Soil Assessment Reports submitted to the client <br /> Kleinfelder has no control over the time required by a regulatory agency to review and approve permit <br /> applications or to supply information from their files for review. <br /> 2 This work will be done by a subcontractor. Kleinfelder selects reputable subcontractors, but does not have full <br /> control over the time required by said companies. <br /> If weather, access, or site conditions restrict our field operations, we may need to revise our <br /> estimated fees. We will contact you for authorization, however, before proceeding with any <br /> additional services. <br /> LIMITATIONS <br /> The proposed Phase I and Limited Phase H scope of work requested by The DeSilva Group, is <br /> limited to evaluating environmental concerns associated with the potential presence of hazardous <br /> substances in conjunction with the transfer or financing of the referenced property. The Phase I <br /> Scope of Work does not include sampling and analysis or other services not described. Other <br /> environmental or geotechnical investigative services can be provided for additional fees. The <br /> scope of services described here is not intended to be inclusive, to identify all potential concerns, <br /> or to eliminate the possibility of environmental problems. Within current technology, no level of <br /> assessment can show conclusively that a property or its structures are completely free of <br /> hazardous substances. Therefore, Kleinfelder cannot offer a certification that the property is <br /> clear of environmental liability. <br /> Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss of property <br /> value, damage, or injury which results from pre-existing hazardous substances being encountered <br /> or present on the project site, or from the discovery of such hazardous substances. Kleinfelder <br /> offers a range of investigative and engineering services to suit the varying needs of our clients. <br /> Although risk can never be eliminated, more detailed and extensive investigations yield more <br /> information, which may help understand and manage the degree of risk. Since such detailed <br /> services involve greater expense, our clients participate in determining the level of service, which <br /> provide adequate information for their purposes at an acceptable level of risk. Acceptance of this <br /> proposal will indicate that The DeSilva Group has reviewed the scope of service and determined <br /> that it does not need or want more services than are being proposed at this time. Any exceptions <br /> should be noted and may result in a change in fees. <br /> 02001PROP.ENV/ST04P222/DGD:ss Page 8 of 10 <br /> Copyright 2004,Kleinfelder,Inc. May 26,2004 <br />