Laserfiche WebLink
I` <br /> WELL CONSTBUQJ10HPETAIL <br /> r <br /> r A Total Depth Of Boring 1 it, <br /> B Diameter Of Boring- in. <br /> Drilling Ms1hod <br /> C Top Of' Box Elevation ft. <br /> 4 Referenced To Moon Seo Loyal <br /> ❑ Referenced To Project Datum <br /> D Caving Length <br /> Material.., 4l.(+[ O <br /> E Casing Diameter <br /> F Depth To Top Perforation ft. <br /> Q Perforated Length Qft. <br /> t <br /> Perforated Interval Fro to_LiL ft. <br /> D ` <br /> Perforakion Type M, <br /> A Perforation Size 0 ' O Zn in. <br /> H Surface Seal From 0 to f1, ' <br /> — Seo] Mataricl._..._.CA_ C lf� <br /> l Backfill From to 4 ft. <br /> 8ee411 Malarial eLA,+- <br /> J Seal From to. .. <br /> aK Seal Material <br /> K Gravel Pack From.. .rto $ ft. <br /> Pack Material <br /> L Bottom Seoi (L <br /> Seal Matodol <br /> NoW Depths measured from Initial ground surface. <br /> HORI20N ENV1Ft0 NT INC •S r� TYPICAL WELL <br /> CONSTRUCTION DIAGRAM <br />