My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2255
>
3500 - Local Oversight Program
>
PR0518431
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 8:54:51 AM
Creation date
10/23/2018 8:12:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518431
PE
3528
FACILITY_ID
FA0013904
FACILITY_NAME
ZE AUTO REPAIR
STREET_NUMBER
2255
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16908055
CURRENT_STATUS
02
SITE_LOCATION
2255 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdrN <br /> H0M N ENVIRONMEI AL INC. <br /> r -Specialists in Site Assessment,Remedial Testing,Design and Operation <br /> December 19, 2006 <br /> MID Eck <br /> Mr. Frank Girardi j, `` �� �L) <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor DEC 2 6 'UuO <br /> Stockton, California .95202-2708 <br /> ENVIRONMENT HEALTH <br /> PEF3& !_r'Ji�J <br /> Subject: Remediation System Installation Schedule <br /> Abdelwahed Facility, Ultramar No. 13792 <br /> 2255 South Airport Way, Stockton California <br /> Mr. Girardi: -- - - <br /> At the request of Ultramar Inc., Horizon Environmental Inc. (Horizon) is submitting a <br /> schedule for installation-and initiation of operation of a remediation system at the subject <br /> site. Submittal of the schedule was requested in a San Joaquin County Environmental <br /> Health Department letter dated November 27, 2006 letter. <br /> As requested, dates of completion for the following milestones are proposed below: <br /> Submittal of remediation system final design January 31, 2007 <br /> 'Installation of,sparge,wcrl,l Hyl'-2 January 31, 2007 <br /> -Installation.of the reme' iation-system May 31, 2007 <br /> Initiation ofremediation system' operations _ June 30, 2007 <br /> The schedule is subject to revision because of the uncertainty involved in the permitting <br /> process, obtaining utility connections and construction contractor availability. Efforts shall <br /> be made-16 expedite-the process in order to reach the milestones by an earlier date. Please <br /> call Horizon at 916-939-2170 if you have any questions or require additional information. <br /> Sincerely, <br /> - — H0F21Z0T NV11Z0N1Vilir:K-1AL !NC.-- <br /> Rexford-,S mi th, <br /> ris.--Rexford-,Smith, PG No. 5307 <br /> Project-Manager <br /> cc: Mr. Steve Coodey,Ultramar.Irfe. <br /> Mr. James.Barton"Regional-Waier-Quality Control Board <br /> Say ed:and.Zakia.Abdel��alted . <br /> 4970-Windplay Drive,#C5 • EI Dorado Hills;CA 95762 • (916)939-2170 • FAX(916)939-2172 <br /> PO,Box 5283 • Bakersfield,CA 93388 (661)589-8389 • FAX(661)589-1456 <br />
The URL can be used to link to this page
Your browser does not support the video tag.