Laserfiche WebLink
GENERAL PROVISIONS <br />1. VALIDATION/REVOCATION - This permit is not valid unless signed by the Public Works Director or his authorized representative. This permit is non- <br />transferable and is void if work is not completed prior to expiration date. An extension may be granted if such is requested forty-eight (48) hours before the <br />permit expires.. <br />2. ACCEPTANCE OF PROVISIONS - It is understood and agreed by the permittee that the performing of any work under the permit shall constitute an <br />acceptance of the provisions. ' <br />3. KEEP PERMIT AT JOBSITE - The permit and control number shall be kept on the jobsite and shall be shown to any repiriYseritativebf the City requesting <br />verification of permit issuance. <br />4, INSPECTION AND APPROVAL -A minimum of 24 hours notice shall be required prior to placing any backfill, connection-to.any existing facility„or the . <br />placement of any concrete or asphalt paving. inspection shall not be deemed a waiver on the part of the. City of the right to demand.cotrection.of defects <br />discovered ata subsequent date. <br />5. STANDARD PLANS AND SPECIFICATIONS - All work shall conform'to the City of Stockton Standard Plans and 'Specifications. <br />6: - -SURVEY-MONUMENT PRE$ERVAVION - Any mdnuments including, but not limited to, chisel crosses, witness comers, and iron pins that control the <br />location of subdivisions, tracts, boundaries, property lines, roads, streets, or provide survey controls, and that may be disturbed or destroyed during <br />construction, shall -bei referenced by a licensed land surveyor and reset in -the surface of the new:constducrion or set a germanbnt-witness monument: <br />Comer records or Records of Survey shall be filed as required. (California Business and Professions Code 8771 and California Streets and Highways <br />Code 732.5, 1492.5, 1810.5) <br />7. MINIMUM INTERFERENCE WITH AND PROTECTION OF TRAFFIC - Atl work shall be planned and carried out so there will be the least possible <br />inconvenience to the traveling public. Placing of lights, barricades, warning signs and other safety devices required for public safety shag be the <br />responsibility of the permittee. All work -zone traffic controls shall be in accordance with the most current revision of Chapter 5 of the State of California, <br />Department of Transportation Traffic Manual. <br />8. ..STANDARD WORKING HOURS - All work shall be restricted to the hours between 8:30 a.m. and 4:30 p.m-, except on arterials and collectors where the <br />Work'is limited to the hours between 9:00 a -m. and 3:00 p.m., unless otherwise noted on this permit. <br />9. FAILURE TO COMPLY WITH GENERAL PROVISIONS - The permittee agrees to reimburse the City for performing all work and furnishing all materials to <br />correct any failure to comply with these provisions, as well as all applicable City Ordinances and Standard Plans and Specifications currently in effect. <br />10. NOTIFICATION OF UTILITY COMPANY - The permittee shall notify utility companies 48 hours prior to beginning any construction, which may involve <br />underground or overhead facilities and will pay all expenses for any removal or relocation necessary. Valves on water mains may not be turned off without <br />permission of the utility company involved. <br />11. NOTIFICATION OF POLICE, FIRE AND PUBLIC WORKS DEPARTMENTS -When streets are to be blocked, the Police, Fire'and Public Works <br />Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered. Access to fire hydrants shall be maintained <br />at all times. Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer. <br />12. CLEANUP OF JOBSITE - The permittee will remove any refuse material from the jobsite within three days after completion of the work- <br />13- DELINQUENT BILLS - Failure,to pay any delinquent bill accrued under any previous.permit issued by the Public Works Department will be cause for <br />rendering the applicant ineligible for any other permit from tliWPubtic Works Department until such bill is paid. <br />14. MEETING EXISTING IMPROVEMENT - The permittee shal6e responsible for meeting all adjacent frontage improvements such as paving and sidewalks. <br />15. PARKING METER AND TRAFFIC SIGN REMOVAL - The permittee shall contact either the Traffic Maintenance Supervisor at (209) 937-7408, or the <br />Senior. Public Works.Su,pervisor at (209),937-8534. of the Pubi.ic Works Traffic Devices Section, at least 48 hours prior to any parking meter or traffic sign <br />removal- <br />--_; ***IMPORTANT*** <br />MANDATORY Encroachment Permit Procedures <br />To provide a more efficient and economical inspection service for Encroachment Permit construction, the following procedure shall be followed by all permittees: <br />1. Notify the Permit Engineer, (209) 937-8366, to obtain a control number, no less than 24 hours, but not in excess of 72 hours prior to the start of work, <br />and prior to any required inspections as identified below. If work does not begin within 72 hours of the issuance of -a control number, the control <br />number will be invalid and the permittee shall tali for a new control number. (For City Capital Improvement Projects or subdivision improvements, <br />permittee shall contact the assigned City Project Engineer at (209) 937-8411 for specific instructions prior to the beginning of any work.) <br />2, Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction. <br />3. Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work. <br />4, Notify Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection. <br />S. Notify the Permit Engineer upon completion of construction at (209) 937-8381. <br />REQUIRED INSPECTIONS <br />Listed below are several types of construction and points at which inspections must be made, prior to continuing construction operation. Unauthorized <br />continuance of construction beyond an inspection point may result in rejection of all work. <br />CONCRETE: PIPE INSTALLATION: <br />Grade and excavate before forming 1. Excavating and bedding <br />Forming before placement of concrete 2. Pipe installation and/or utility connections <br />Beginning and during asphalt paving 3. Backfill (compaction test may be required) <br />Cleanup and final approval 4. Beginning and during asphalt paving <br />5. Final approval <br />