My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2405
>
3500 - Local Oversight Program
>
PR0543370
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 11:14:33 AM
Creation date
10/23/2018 10:16:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543370
PE
3528
FACILITY_ID
FA0003608
FACILITY_NAME
ARCO AM PM*
STREET_NUMBER
2405
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16910029
CURRENT_STATUS
02
SITE_LOCATION
2405 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br /> rn ; <br /> , �; Chevron <br /> �.: I f <br /> 9440V P m 02 <br /> .00 <br /> Chevron U,SA. Products Company <br /> 6001 Bollinger Canyon Rd., Bldg. L <br /> P.O: Boz 5004 <br /> November 7, 1994 San Ramon, CA 94583-0804 <br /> .Site Assessment& Remediation-Gt;oop <br /> .Phone 15101842-9500 <br /> Ms.,Mary Meays <br /> San Joaquin County Enyiroru'nental Health <br /> P.O. Box.2009 <br /> Stockton, CA 95201 <br /> Re: Former Chevron Station#9-5075, 2405 Airport Waft, Stockton;CA <br /> k <br /> Attached Additional Assessment Report(GTI, 9123194)' <br /> Dear Ms: Mcays <br /> E Please find attached a report'dated September' 23;,'1994; which was .prepared by Chevron's <br /> consultant;'Groundwater Technology Inc. (GTI), to describe_the field activities occurring at the . <br /> subject site .during May through August, 1994:" On May 16,`.1994; GTI drilled a soil boring, <br /> collected soil samples, and installed.monitoring well MW-5::On July 7, .1994, GTI repaired well . <br /> MW-4.-Monitoring wells MW-1 through MW-4 were sampled on July 8, 1994. Monitoring well <br /> MW,5 was sampled on August 22 1994. <br /> There were no petroleum hydrocarbons"detected in.any of the soil samples collected at well MW-5. <br /> Groundwater samples collected :from al'l of the mor itori.ng-4611s contained no detectable <br /> concentrations of petroleum'hydrocarbons Groundwater elevation measurements taken on July 8, <br /> I�- 1994 and on•"August 22, 1994"revealed groundwater gradients 'of 0.001 and 0:002 ft/ft, <br /> respectively. <br /> The attached report by GTI also provides information which shows there are seven.groundwater . <br /> extraction wells located within 2000 feet of-166 subject site. <br /> .J <br /> Chevron will continue monitoring"groundwater at the subject site on a quarterly basis. Continued ' <br /> non-detect results will support a request"for case closure."If you have any questions or.comments, <br /> I can be"reached at(510)"842-8695. <br /> Sincerely, <br /> Brett L. Hunter <br /> 'Environmental'Engineer <br /> Site Assessment and Remediation " <br /> f3ss;;yc!abie _ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.