My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000089
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
3500 - Local Oversight Program
>
PR0543371
>
ARCHIVED REPORTS XR0000089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 3:23:11 PM
Creation date
10/23/2018 1:10:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000089
FileName_PostFix
XR0000089
RECORD_ID
PR0543371
PE
3528
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc.
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />' 4 REMEDIATION PILOT TEST ACTIVITIES <br />' Three separate pilot tests will be conducted at the Earth <br />Grains Facility. A soil venting pilot test (vent test) will be <br />initially performed to evaluate hydrocarbon vapors in the vadose <br />zone near the source of the hydrocarbon release. <br />An air sparging pilot test (sparge test) will then be <br />conducted to evaluate the effectiveness of this technology to <br />remediate impacted groundwater. This test will be performed <br />without soil venting to evaluate if impacted sparge vapors <br />accumulate in the vadose zone to a concentration which would <br />require a venting system to control sparge vapor migration. <br />A combination soil venting and air sparging pilot (vent test <br />/sparge test) will then be conducted to provide design information <br />needed for a full scale vent/sparge system, if required. <br />4.1 Data Evaluation <br />Venting and air sparging test data will be used to complete <br />' the design of a full --scale remediation system, design a vapor <br />treatment system (if necessary), and prepare air permit <br />applications for the full-scale system. Design parameters will <br />include radius--of-influence of the air sparging and soil venting <br />systems, air sparging and venting blower specifications, predicted <br />vapor emission concentrations and recovery rates, and <br />number of vent wells and sparge wells required to remediate <br />groundwater at the facility. <br />4.2 Sparge Well and Piezometer Installation <br />one sparge well and two piezometers will be installed at the <br />locations shown in Figure 4. The wells to be used during the test <br />include: <br />07/94/1213821125997/REM REP/1 July 1, 1994 9 26am <br />
The URL can be used to link to this page
Your browser does not support the video tag.