Laserfiche WebLink
File No 7.070 2 <br /> 30 NovcnAvr 1993 <br /> Page S <br /> S 0 Anticipated Further. Actions <br /> Analysis of subsurface conditions is being performed to evaluate the best remedial options for <br /> maximizing the effectiveness of a groundwater treatment system Following completion of the <br />' analysis, a Final Remediation Plan (FRP) describing the installation and operation of a treatment <br /> system will be submitted As of this letter, a date for beginning preparation of the FRP has not yet <br /> been determined Until an FRP is submitted, quarterly sampling of the groundwater quality will <br />' continue <br /> Burlington Environmental Inc of Columbia, Illinois the consultant providing engineering oversight <br />' for this project, is preparing a workplan to install additional groundwater monitoring wells at the site <br /> The additional wells are to replace the existing wells which have been dry over the last several years <br /> The new wells are needed to accurately dctei mine the lateral extent of groundwater contamination <br />' and subsequently design an clfcctivc remediation plan Based on preliminary discussions with <br /> Burlington Environmental, approximately three IILW wells will be installed A workplan for the well <br /> installation is expected to be completed by the Lnd of December 1993 and submitted to the San <br /> Joaquin County Health Department 101 approval <br /> i <br /> 1 <br /> 1 ' <br /> 1 <br /> ANDERSON <br /> CONSULTING <br /> \/J GROUP <br />