Laserfiche WebLink
Page 4 <br /> Ms Margaret Lagono <br />' June 24, 1996 <br />' CLOSING <br /> The next quarterly groundwater monitoring for this facility is scheduled for nvd-August <br />' ResuIts from that event will be duly submitted to San Joaquin County Public Health <br /> Services If you have questions, or desire additional information, please call Mark <br /> Milward or Clay Frankenreiter (Philip) at (618) 281-7173 <br />' Sincerely, <br /> PHILIP ENVIRONMENTAL SERVICES CORPORATION <br /> y <br />' Clay A Frankenreiter <br /> Geologist D GFp�o <br /> JOHN R N� <br /> �- CARROW <br /> No 5525 <br /> Jo R Carrow, R G No 5525 ` ° f <br /> Geologist <br /> Attachments <br /> Figure 1 - Site Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Groundwater Elevation Contour Map <br />' Figure 4 - Total Volatile Hydrocarbons as Gasoline in Groundwater <br /> Figure 5 -Benzene in Groundwater <br /> Table 1 - Quarterly Groundwater Elevation Data <br /> Table 2 -Historical Groundwater Elevation Data <br /> Table 3 - Quarterly Groundwater Sample Analytical Results <br />' Table 4 - Historic Groundwater Sample Analytical Results <br /> Appendix A- Groundwater Sampling and Analysis Procedures <br /> Appendix B - Water Sample Field Data Sheets <br />' Appendix C - Chain-of-Custody Records and Certified Analytical Reports <br /> E ICTI IOMQTR96 DOC <br />