Laserfiche WebLink
December 1986, which initiated the permanent removal of both USTs The <br /> two diesel-fuel USTs were removed in September 1989 <br /> In July and September 1987, Environmental Science & Engineering (ESE) <br /> installed three groundwater monitoring wells (MW-I through MW-3) In <br /> January 1988, Anderson Consulting Group (ACG) installed wells MW-4 and <br /> MW-5 ACG subsequently drilled soil borings 90-1 and 90-2 and installed <br /> wells MW-6 and MW-7 in February 1990 and MW-8 in September 1990 PSC <br /> (formerly Burlington Environmental) installed wells MW-9 through MW-13 <br /> in March 1994 and piezometers PZ-1 and PZ-2 and air sparging well SP-1 in <br /> September 1994 <br /> PSC performed a soil venting and air sparging pilot test in October and <br /> November of 1994 to evaluate the effectiveness of this remediation <br />' technology Soil venting tests were performed using well MW-i, and air <br /> sparging tests were performed using well SP-I Results of the tests, contained <br /> in PSC's February 1, 1995 Final Remediation Plan, indicated that soil venting <br /> and air sparging would be effective in remediating hydrocarbon impact <br /> In June 1995, PSC proceeded with the installation of air sparging wells SP-2 <br /> t through SP-6 However, implementation of the sparge and vent remediation <br /> was postponed due to petroleum hydrocarbon concentration reductions that <br /> were observed at the time to be naturally occurring at the site <br /> In May 1999, PSC performed a subsurface investigation using cone <br /> penetrometer (CPT) technology Three CPT borings (CPT-1 through CPT-3) <br /> were driven, and soil and groundwater samples were collected for analysis <br /> This CPT investigation indicated that the lateral extent of impacted <br /> groundwater is largely contained within the Earthgrains property boundaries <br /> Results from this investigation were reported in PSC's May 1999 Subsurface <br /> Investigation and Groundwater Monitoring Report <br /> An additional air sparging and soil venting pilot test was performed in June <br /> 2000 using the newly drilled VW-1 as the vent well This test was conducted <br /> in general accordance with procedures described in PSC's May 15, 2000 Pilot <br /> Testing Work Plan Once again, pilot test results indicated that this technology <br /> would be an effective method of treating petroleum hydrocarbon impact at the <br /> site Test results and designs for an air sparging and soil venting remediation <br /> system are contained in PSC's August 31, 2000 Remedial Action Work Plan <br /> Operation of a full scale air sparging and soil venting remediation system was <br />' initiated on April 25, 2001 Installation of a new air sparging well (SP-A) was <br /> performed on March 14, 2002 <br /> i <br /> 5 <br /> August 2002 Groundwater Monitoring And Remediation Status Report <br /> i <br /> rhe Farlhgrams Baking Company <br /> 2651 South Airport Way Stockton,California <br /> Prepared for THE LARTIfGRAINS BAkINC COMPANY Prepared by Philip Services Corp <br /> H SLNV1624001321121382CG\Stockton%StocktonNoso2mon doc September 2 2002 <br />