Laserfiche WebLink
Notes <br /> 1 During the 51212001, the system was found to be inoperable due to damaged electrical controls, which were repaired on May 4, 2001 <br /> 2 Due to peak electrical power demands at the facility, the remediation unit has only been operated approximately 18 hrs per day since <br /> June 1, 2001 The unit is manually turned off at noon each day and re-started at 6 00 p m <br /> 3 Due to elevated effluent PID readings, the unit was shut down during the June 4, 2001 site visit <br /> 4 New secondary carbon vessel was installed on June 6, 2001, while the original secondary unit was moved to the primary position and the original <br /> primary unit was removed from service <br /> 5 Primary and secondary carbon vessels were changed out on June 20, 2001 using 160 lb units for both positions <br /> 6 Primary carbon vessel replaced with new 1,000 lb vessel on June 22, 2001 <br /> 7 Unit shut down on 7/25 pending carbon change out and carbon disposal acceptance <br /> 8 Unit put back into operation with new carbon vessels (1,000 lb primary and 160 lb secondary) <br /> H Ienv\62400132\stockton\remediation system air emissions doc <br />