Laserfiche WebLink
6 ESTIMATED SCHEDULE <br /> The estimated schedule for equipment specification,procurement, <br /> Installation, and startup Is In as shown below Equipment delivery schedules <br /> may vary at the time of order No time has been allocated for preparation of <br /> bid documents Construction schedules may vary depending on seasonal <br /> conditions Utility service connections and permit applications will also <br /> affect construction schedules <br />' ESTIMATED CONSTRUCTION SCHEDULE <br /> ITEM WEEK <br /> NUMBER PROJECT TASKS 1 2 3 4 5 6 7 8 9 to 11 12 <br />' I System Specification <br /> 2 JEquipment Procurement <br /> 3 Equipment Assembly <br /> 4 Well and Piping Installation <br /> 5 Equipment Installation <br /> 6 System Startup AEL <br /> 1 <br /> r <br />�l <br /> Remedial Action Work Plan <br /> Prepared For TRE EARTtICRAINS COMPA14Y 19 Prepared by Philip Services Corp <br /> H 1ENv1624001451RAP61300 doe 8131100 <br />