Laserfiche WebLink
4. Operation And Monitoring Plans <br /> Yes No <br /> ClDoes the CAP propose daily monitoring for the first 7 to 10 <br /> days of flow measurements, vacuum readings, and vapor <br /> ' concentrations from each extraction vent, the manifold, and <br /> the eluentck? <br /> re ter'pi64tw*. <br /> ' ❑ Does the GAP propose biweekly to monthly monitoring of <br /> flow measurements, vacuum readings, and vapor <br /> concentrations from each extraction vent, the manifold, and <br /> the effluent stack? <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> October 1994 II-3S <br />