Laserfiche WebLink
❑ Have groundwater extraction rates been determined? <br /> ❑ r� Is a system control/alarm system included in the <br /> design? <br /> ❑ <br /> is a free product recovery system needed? <br /> 4. Operating and Monitoring Plans <br /> Yes No <br /> ❑ r1 Is hydraulic balancing proposed as the first activity in <br /> ' start-up? <br /> r� ❑ Is routine system operation and monitoring proposed? <br /> ❑ Is subsurface soil and groundwater sampling proposed <br /> for tracking constituent reduction and biodegradation <br /> conditions? <br /> ❑ Is a schedule for tracking constituent reduction <br /> proposed? <br /> ❑ ❑ Is nutrient addition (if necessary) proposed to be <br /> controlled on a periodic rather than continuous basis? <br /> nl�rC 'p�zOPoS� <br /> 1 <br /> 1 <br /> 5-38 May 1995 <br />