Laserfiche WebLink
BP Chemical, Advanced Materials Div., P.O. Box 6189, Stockton, CA October 20, 1992 <br /> Mr. Lon Kitagawa 4 <br /> Samples of the stockpiled soil will be analyzed for disposal purposes. The analytical methods for those <br /> samples include: EPA Method 8015 Modified (for TPH-G); EPA Method 8244 (volatile organic <br /> compounds); EPA Method 544 (for EDB); EPA Method 7000 (for total lead); and reactivity, corrosivity, <br /> and ignitability. The stockpile soil samples will be analyzed by an off-site, state-certified laboratory. <br /> Excavation Backfilling and Site Restoration <br /> After the overexcavat;on has been completed, and the removal of affected soil has been confirmed with <br /> the analytical results, the excavation will be backfilled with clean fill material. The clean fill material will <br /> be provided by BP Chemical. The source for that material is from an undeveloped portion of the SP <br /> Chemical facility. Before backfilling, a sample of the source material will be tested for compaction <br /> characteristics. The fill material will be placed in 1-to 2-foot-thick layers and compacted to engineering <br /> standards for that area <br /> Following the excavation backfilling and compaction, the ground surface will be leveled and restored to <br /> it's original condition. At this time, the ground surface will not be paved of covered with concrete. <br /> Soil Disposal <br /> The stockpiled soil will be disposed of at an off-site licensed landfill facility. The landfill will be chosen <br /> based on the analytical results of the samples tested for waste characteristics. Based on the results of <br /> the previous site assessment, it is anticipated that soil from this excavation will be accepted at a Class II <br /> or Class III landfill, and will not require special handling as a hazardous waste. <br /> Summary Report Preparation <br /> Following the above described activities, a summary report will be prepared to document each of the <br /> tasks conducted during the corrective action. The summary report will include a detailed discussion of <br /> the field activities, tabulated summary of analytical results, and copies of the certified laboratory data <br /> sheets. A request for regulatory site closure by the SJCEHD will be requested at that time. <br /> SCHEDULE <br /> Groundwater Technology plans to complete the soil excavation, sampling, soil characterization, and <br /> excavation backfilling within approximately two weeks after receiving authorization from the SJCEHD to <br /> proceed with this Corrective Actions Work Plan. Arrangements for off-site soil disposal will be completed <br /> following the soil characterization and after receiving approval from the designated landfill facility. A <br /> summary report documenting field activities and analytical results will be prepared and submitted to the <br /> SJCEHD approximately four weeks after the soil disposal. <br /> GROUNDWATER <br /> �. .:,TECHNOLOGY.INC. <br />