Laserfiche WebLink
BP Chemical, Advanced Materials Div., P.O. Box 6189, Stockton, CA October 20, 1992 <br /> Mr. Lon Kitagawa 5 <br /> SCHEDULE <br /> Groundwater Technology plans to complete the soil excavation, sampling, soil characterization, and <br /> excavation backfilling within approximately two weeks after.receiving authorization from the SJCEHD <br /> to proceed with this Corrective Actions Work Plan. Arrangements for off-site soil disposal will be <br /> completed following the soil characterization and after receiving approval.from the designated landfill <br /> facility. A summary report documenting field activities and analytical results will be prepared and <br /> submitted to the SJCEHD approximately four weeks after the soil disposal. <br /> If you have any questions regarding this Corrective Action Work Plan, please call me at (510) 671- <br /> 2387. <br /> Sincerely, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> David R. Kleesattel, R.G. <br /> District Hydrogeologist <br /> Project Manager <br /> Attachment: Site Pian <br /> cc: Ms. Margaret Lagorio, REHS <br /> San Joaquin County Public Health Services <br /> 1601 East Hazelton Avenue <br /> Stockton, California 95201 <br /> GROUNDWATER <br /> TECHNOLOGY,INC. <br />