My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
3500 - Local Oversight Program
>
PR0543373
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 5:12:19 PM
Creation date
10/23/2018 2:02:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0543373
PE
3528
FACILITY_ID
FA0006078
FACILITY_NAME
BP CHEMICALS INC*
STREET_NUMBER
3437
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
17702033
CURRENT_STATUS
02
SITE_LOCATION
3437 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> i3e <br /> h BP Chemical ' April 28, 1992 <br /> 02320 2258 Page 3 <br /> t it <br /> I RECOMMENDATIONS <br /> Based on the findings of this secondary investigation, Groundwater Technology recommends the <br /> following remedial action for the former underground tank excavation. as outlined below: <br /> ■ Overexcavation of the tank pit to remove soil a4ected� by leaking underground tanks. <br /> This operation should be observed by qualified field personnel, and overseen by a <br /> California registered geologist. A PID shouldbei utilized during the overexcavation to <br /> f provide qualitative evidence of the limits of hydrocarbon impact. <br /> ■ After excavation, clean closure samples from the sidewalls and floor of the excavation <br />{ should be collected through the use of a backhoe or similar equipment. Closure <br /> samples should be analyzed for BTEX, TPH-G, organid lead, and ethylene dibromide. <br /> I <br />' ■ Backfilling of the excavation with clean soil, and compacting the material to existing <br /> i <br /> engineering standards. <br /> ■ Proper characterization, profiling, transport, land disposal of the impacted soil <br /> associated with the excavation. <br /> I <br /> i <br /> Groundwater Technology is please to provide this service for BP Chemical. If you have any questions <br /> or comments regarding this report, please contact our West Sacramento office at (916) 372-4700. <br /> Sincerely, <br /> GROUNDWATER TECHN LOGY, INC. I <br />,I <br /> t44 <br /> �J IRONMF�a� <br /> I <br /> CR. D. ROBERTSON E. Gq <br /> r <br /> 1.0 <br /> Environmental Geologist �W AGO F � <br /> Project Coor ' or i <br /> No. 0385 <br /> Expires: <br /> SCOTT E. GABLE, R.E.A. 3851 <br /> Environmental GeologistNn.+� <br /> i Project Manager I 4 <br /> I <br /> I <br /> l Zen, �{ <br /> E. K. SIMONIS, R.G. tEU)1L 5= <br /> Senior Environmental Geologist <br /> CDR/SEG/EKS:rc <br /> No. 4422 <br /> Attachments <br /> 2268P$A.L'rR <br /> OF Co`%' I ' k- GROUNDWATER <br /> ? _ TECHNOLOGY <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.