Laserfiche WebLink
GENERAL PROVISIONS <br /> rALIDATION — This permit is not valid unless signed by the Public Works Director or his authorized representative. <br /> 1EVOCATION — This permit is non-transferable and Is void if work is not completed prior to expiration date. An extension may be granted <br /> f such extension is requested forty-eight hours before the permit expires. <br />%CCEPTANCE OF PROVISIONS — It is understood and agreed by the permittee that the doing of any work under the permit shall constitute <br /> in acceptance of the provisions. <br /> KEEP PERMIT ON JOBSITE — The permit and control number shall be kept on the jobsite and shall be shown to any representative of the <br /> City requesting verification of permit issuance. <br /> INSPECTION AND APPROVAL — minimum <br /> lof any �onorete or paving work.our rIn Inspection shs notice all not be l be f deemred ed aior owa ver on the part placing any llof the City of <br /> to any existing facility or the place Y <br /> the right to demand correction of defects discovered at a subsequent date. <br /> STANDARD SPECIFICATIONS — All work shall conform to the City of Stockton standard specifications. <br /> ut so least <br /> nd <br /> MINIMUM INTERFERENCE WITH AND PROTECTION oOFghRAbarri ades,llwork shall be warning signs andnned otheasafetyrdevicoes requfired orre 1publ cbe esafety <br /> possible inconvenience to the trave g public. <br /> permittee. All safety provisions and devices shall conform to the requirements of Chapter 5 of the State o <br /> shall be the responsibility of the <br /> California Traffic Manual. s to <br /> FAILURE TO COMPLY WITH GENERAL PROVISIONS prov shoos as well amittee s applicable uCityrse torrd nhe lancesty for pand standards and specificaterforming all work and ions <br /> all material to correct any failure to comply <br /> currently in effect. <br /> NOTIFICATION OF UTILITY COMPANY The <br /> permittee w pay all ll notify <br /> ses for anyrrpanies emoval o8hours re ocationone essary.beginning construction <br /> Valves on waterma ns may <br /> may involve underground or overhead <br /> facilities <br /> not be turned off without permission of the utility company involved. <br /> hen streets <br /> NOTIFICATION OF POLICE, FIRE A eDcPUdBLI he tOreetSsDto be blocked and/or MENTS — Nwhen traffic isrdelayed oe to be lrr hindered. Acocked, the cess torfire nhdyd hydrants <br /> Works Departments are to be notified Y Permit <br /> shall be maintained at all times. Streets will not be closed withrefuse mateP alvfrom theof <br /> jobsite within hnEngineer three days after gcompletion of the work. <br /> CLEANUP OF JOBSITE — The permittee will remove any <br />. DELINQUENT BILLS — Failure to pnelia any <br /> delinquent <br /> othelr permit fdromder any previous the D partment of PubllicsWorks until sued by lesuuc Department <br /> is paid.Public Works will <br /> be cause for rendering the applicant g <br /> 3. MEETING EXISTING IMPROVEMENT — The permittee shall be responsible for meeting all adjacent frontage improvements such as paving <br /> and sidewalks. <br /> D THE PERMITTEE <br /> To provide a more efficient and economical inspection service for Encroachment Permit construction,we are asking that the following procedure <br /> e followed by all permittees: <br /> 1. Notify the Permit Engineer, (209) 937-8411,and obtain a control number at least twenty-four (24) hours prior to the start of work. <br /> 2. Discuss with the Permit Engineer or inspector any unusual or difficult features of the construction. <br /> 3. Advise Permit Engineer of name and phone number of contact person for the project prior to beginning work. <br /> 4. Notify the Permit Engineer one day in advance to cancel a scheduled inspection or to request an additional or earlier inspection. <br /> 5. Notify the Permit Engineer upon completion of construction. (209) 937-8411. <br /> INSPECTION SCHEDULE <br /> Listed below are several types of construction and points at which inspection must be made prior to continuing construction operation. Unauthorized <br /> 3ontinuance of construction beyond an inspection point may result in rejection of all work. <br /> PIPE LAYING: <br /> CONCRETE 1. Excavation and bedding. <br /> 1. Grade and excavation before forming. 2. Pipe laying. <br /> 2. Forms before placement of concrete. <br /> 3. Cleanup and final approval. 3. Backfill (compaction test may be required). <br /> 4. Final approval. <br />