Laserfiche WebLink
Mr. Gerald Djuth <br /> October 23, 2003 <br /> Page 4 <br /> to the onset of the rainy season, the well could be constructed and the bladder pump <br /> installed and ready to sample within one week after startup. <br /> Please do not hesitate to call me at our Walnut Creek office at (925) 941-3723 or contact <br /> Bill Barber at (216) 271-8038 if you have any questions or require clarification. <br /> Very truly yours, <br /> PARSO <br /> Frederick C. intzer, C.E.G. <br /> Project Manager <br /> Attachments: <br /> Figure 1 —Proposed Groundwater Monitoring Well at 3525 Zephyr Court <br /> Figure 2—Two-inch Monitoring Well Design for Shallow Groundwater Zone <br /> cc: Mr. William Barber, Group Environmental Management Company <br /> Ms. Margaret Lagorio, San Joaquin County PHS, Environmental Health Div. <br /> Mr. Lon Kitagawa, Applied Aerospace Structures Corp. <br />