Laserfiche WebLink
• <br />Mr. Gerald Djuth <br />January 20, 2006 <br />Page 2 <br />it <br />The RWQCB (Djuth 2003) accepted the findings and recommendations of the report. <br />The additional offsite well (1\4W-15) was installed in August 2004. <br />Rationale <br />MW -15 has been sampled in six consecutive quarterly events. The data from MW -5R <br />continued tcentrations <br />show evidence of offsite migration of contaminants at low <br />and MW -15 have concon of TCE and 1,1-DCE at MW -5R cycled within <br />concentrations. In 2005 <br />-15 contaminants were detected ereporting <br />the typical historical range. At MWµ11 lg <br />limit of 0.5 µg/L in all sampling events; maximums of 12 µg/L TCE and 2.3 <br />DCE were detected in November 2004. <br />In view of this condition, the Semiannual <br />(Parsons 2005) proposed the following: <br />"A plan will be developed for remedial action in the vicinity of MW -5R. <br />The objective will be to interrupt nmigration <br />use grMW 5RMW-15 <br />aand contaminants <br />for <br />across the property line and con <br />confirmation groundwater monitoring. <br />It is proposed to drill and install one groundwater extraction well approximately 50 feet <br />northwest of monitoring well MW -5R. The well will be located in a breezeway between <br />Buildings #1 and #2 as indicated on Figure 1.. <br />Progress Report and Annual Summary <br />Planning and Installation Procedure <br />Planning logistics include obtaining a permit for well installation from the San Joaquin <br />County Public Health Service, Environmental Health Division (SJC/EHD) and clearance <br />for utilities. The boring will be started by vacuum excavation of at least 110% of the hole <br />diameter to a depth of 5 feet. <br />The well boring will be drilled using a rubber track mounted limited access, hollow -stem <br />auger rig with 10 -inch diameter augers. The subsurface soil will be sampled at <br />approximately 5 -foot intervals using a standard 18 -inch split -spoon drive sampler. Soil <br />samples and auger cuttings will be logged and identified by visual/manual examination <br />ver <br />per ASTM D-2487 (equivalent to USCS soil classification system) <br />. Percent photographedrco nythf <br />drive samples will be recorded and representative samples will <br />field. Exact placement of the screened length and pump depth placement will be selected <br />ging. A 4 -inch diameter extraction well will be <br />based on the results of drill hole log <br />constructed with a 15- to 20 -foot long screened as indicated on the well <br />interval <br />construction diagram (Figure 2). <br />7) will <br />The discharge water piping and control conduits from <br />o#2 and hung from the celiing beams <br />be installed through the foundation wall of Building to the <br />in Buildings #4 and #6 on overhead hangers. wFl be buriedrtn a trench. m the noh wall of BuThe n� w6p ping <br />groundwater treatment compound, the pipes <br />