Laserfiche WebLink
Mr. Gerald Djuth <br />January 20, 2006 <br />Page 5 <br />ntal Coordinator, and Christopher Hansen, Plant Engineer. <br />be routed overhead through the buildings; <br />Kitagawa, AASC's at the, <br />inside the <br />AASC requested that the discharger piping <br />nof moving material and machinery Completion of <br />therefore, there will be internal log ng and electrical conduits. <br />plant in sequence require a roximately two weeks work <br />uence with instal;lat on is estimated to req pp contractor availability, it is <br />p royal and sub <br />the piping and conduit rnsta tan app 2006. <br />Thus, assuming timely work p <br />duration. operating late in the month of February <br />g <br />anticipated that the well could start op 941-3723 or contact <br />92 <br />Please do not hesitate to call me at our Walnut nreelk1office ions. or( require <br />clarification. <br />Mike McAnulty at (714) 228-6709 if You have any <br />Very truly Yours, <br />I <br />Frederick C. K4 <br />Project Manager <br />C.E.G. `* <br />KIC,KC.(�. <br />L No. EG 1077 <br />CERTIFIED <br />ENGINEERING <br />�_ GEOLOGIST/ <br />CNV <br />Attachments:ping <br />Figure 1 — Location of Proposed Extraction <br />Wella hemiat c <br />Figure 2 — Groundwater Extraction Wand P' <br />b <br />a Palma, <br />cc: Mr. Michael McAnulty, Atlantic Rn Corundt PHS, EnvLHealth D v.,Stockton <br />Ms. Margaret Lagorio, San <br />gros ace Structures Corp. <br />Mr. Lon Kitagawa, Applied AeP <br />Q'. <br />