My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2900 - Site Mitigation Program
>
PR0529622
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 5:43:15 PM
Creation date
10/23/2018 2:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0529622
PE
2960
FACILITY_ID
FA0019603
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kPARSONS 0 0 <br />LETTER OF TRANSMITTAL <br />Parsons Date: February 8, 2006 <br />2121 N. California Blvd., Suite 500 <br />Walnut Creek, CA 94596 <br />Phone: (925) 941-3723 <br />Fax: (925) 979-9781 Parsons Project: 442107 <br />TO: ATTN: Mr. Jeff Wong <br />San Joaquin County Environmental Health Department <br />304 E. Weber Avenue, 3rd Floor RE: Document Review for Extraction <br />Stockton, CA 95202 Well Installation Permit <br />WE ARE SENDING YOU: <br />ATTACHED: XX <br />UNDER SEPARATE COVER: <br />DOCUMENTS: <br />OTHER: <br />VIA MAIL EXPRESS MAIL FED EX XX OTHER <br />QUANTITY DATE <br />ITEM <br />Site: <br />Applied Aerospace Structures Corporation <br />3437 South Airport Way <br />Stockton, CA <br />1 2/08/06 <br />Postal money order for $279.00 <br />1 1/20/06 <br />Copy of work plan for well installation <br />REMARKS: <br />Enclosed please find a check for $279.00 in payment for 3 hours document review for the proposed <br />extraction well construction. The planned start date is Monday, February 13, 2006. The plan is to begin <br />with potholing for utility clearance, drill and construct the well, and be ready to seal and grout on the <br />same day. I will inform you if there are any changes in plans. <br />Also included herewith is the work plan letter with a location map and well construction schematic <br />Fred Kintzer, Pfojeg( Manager <br />tr_SJC_3 hr permit review_GW-TDOC 2/8/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.