Laserfiche WebLink
KL E/NFEL DER <br /> Bright P.,P"Right Solutions. <br /> • Kleinfelder's conclusions and recommendations based on the data obtained <br /> during sampling activities. <br /> As set forth above, all information gathered during the study by Kleinfelder is <br /> considered confidential and will be released only upon written authorization from the <br /> client or as required by law. California law requires a person to inform the state if a <br /> situation is encountered that can be considered an immediate endangerment to the <br /> public's health or welfare and/or to the environment. Therefore, the client shall be <br /> contractually bound to make said disclosures in lieu of Kleinfelder, its owners, <br /> principals, employees or subcontractors. <br /> APPROXIMATE PROJECT SCHEDULE <br /> Based on the proposed methodology, scope of work and assumptions described below, <br /> the following approximate project schedule has been formulated: <br /> Approximate Task <br /> Timeline <br /> Week 0 — 2 1 - USA Markin /Permittin * <br /> Week 2 — 3 2 - Field Activities* <br /> Week 3 — 5 3 - Chemical Analyses* <br /> Week 5 — 7 4 - Reporting <br /> "Time estimates may vary based on external scheduling or services by <br /> the County (permitting) and subcontractor/s (pushprobe scheduling, <br /> laboratory analyses/reporting). <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This work plan and the attached cost estimate are based on the following assumptions: <br /> • This work plan is based on the assumption that while USA will be <br /> contacted, AASC personnel will clearly mark utilities and will provide any <br /> and all available survey maps or other data to determine the location of <br /> underground storage tanks, existing subsurface structures, underground <br /> utilities and services. <br /> • Adequate workspace and access will be provided by the client. <br /> • Kleinfelder is not responsible for the site safety of others. <br /> • The client should be aware that penetrating the site's surface is inherently <br /> risky. It is impossible to determine with certainty the precise location of all <br /> structures (such as irrigation lines, septic system tanks or leach fields) <br /> which may be buried in the ground. Kleinfelder's fee is not adequate to <br /> 95642.ENV/ST09P060 Page 4 of 6 April 2, 2009 <br /> Copyright 2009 Kleinfelder <br />