My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2900 - Site Mitigation Program
>
PR0529622
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:53:12 PM
Creation date
10/23/2018 2:20:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529622
PE
2960
FACILITY_ID
FA0019603
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING ORDER NO.R5-2010-0818 - 5 - <br /> BP <br /> 5 - <br /> BP AMERICA AND APPLIED AEROSPACE STRUCTURES CORPORATION <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> provided on CD or DVD and included in the report. The Central Valley Water <br /> Board may request additional data as necessary. <br /> (h) A copy of the laboratory analytical data report. <br /> (i) If applicable, the status of any ongoing remediation, including cumulative <br /> information on the mass of pollutant removed from the subsurface, system <br /> operating time, the effectiveness of the remediation system, and any field <br /> notes pertaining to the operation and maintenance of the system. <br /> (j) If applicable, the reasons for and duration of all interruptions in the operation <br /> of any remediation system, and actions planned or taken to correct and <br /> prevent interruptions. <br /> 8. An Annual Report shall be submitted to the Central Valley Water Board by <br /> 1 November of each year. This report shall contain an evaluation of the <br /> effectiveness and progress of the investigation and remediation, and may be <br /> substituted for the second semi-annual monitoring report, provided that all <br /> information that must be submitted in the fourth quarter or semi-annual report is <br /> included along with the following minimum information: <br /> (a) Both tabular and graphical summaries of all data obtained during the year. <br /> (b) Groundwater contour maps and pollutant concentration maps containing all <br /> data obtained during the previous year. <br /> (c) A discussion of the long-term trends in the concentrations of the pollutants in <br /> the groundwater monitoring wells. <br /> (d) An analysis of whether the pollutant plume is being captured by an extraction <br /> system or is continuing to spread. <br /> (e) A description of all remedial activities conducted during the year, an analysis <br /> of their effectiveness in removing the pollutants, and plans to improve <br /> remediation system effectiveness. <br /> (f) An identification of any data gaps and potential deficiencies/redundancies in <br /> the monitoring system or reporting program. <br /> (g) If applicable, a proposal and rationale for any revisions to the groundwater <br /> sampling plan frequency and/or list of analytes. <br /> 9. The results of any monitoring done more frequently than required at the locations <br /> specified in the MRP also shall be reported to the Central Valley Water-Board. <br /> 10.The Discharger shall implement the above monitoring program as of the effective <br /> date of the Order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.