My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
FIELD DOCUMENTS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:04:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tisk 1. Planning end �ex'mittng <br /> The proposed scope of work will be managed by lir. Joseph Ramage of IT's Sacramento`caffic . <br /> image has nine years of experience in the environmental consulting and oil and gas; <br /> irtclustries He is a Registered Geologist in the state of California and holds master's degrees <br /> zt both geology aurid business administration. <br /> e. planning a permitting task includes a preliminary site inspection, prep ratio a of a <br /> t tir hark and heft.and safety plan and the acquisition of necessary perchits. <br /> A i'�el%nainary Site:Inspection <br /> IT wrll perforri a pr lin iraary srte inspection to gather the inforrna�ttcn necessary. e <br /> field work. and <br /> ..are tl site background section of the Problem assessment Re.ort Tl <br /> executlon of this task will indi e a site visit to determine workconstraints, thAk drilling <br /> loanons, and meet utility line rveyer to clear drilling locations: <br /> Prep re Workplan and health and Safety flan <br /> IT will prepare a workplan describing field procedures and methods to be used to accomglh <br /> the scope of work. The plan will be submitted. to PISS/EMD for approval prier to beginning <br /> field activities. It is assumed that'P / I will require two weeks to review and authorize the <br /> work plan. <br /> Prior to mobilizing for field activities, IT will amend our existing site-specific health and safety <br /> plan. The health and safety plan will include safety procedures for work to be performed, <br /> chemical hazard informations site safety officers, and preferred medical emergency locations. <br /> C Obtain Necessary Permits <br /> Tc rug the proposed scope of work, a soil boring and monitoring well permit will be <br /> obtai 4ed from PHS/EHD. Since all drilling will be conducted within the Airport property, <br /> neither off-site access agreements nor encroachment permits will be required. <br /> At least 72 hours `or to drilling, IT will notify Underground Service Alert (USA) to <br /> a routine utility clrnce inspection. In addition, utility clearance for each sample Iatt+ dill <br /> be performed dorm the Preliminary Site Inspection using a professional utility line l tttr <br /> service. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.