Laserfiche WebLink
Stockton Metro Airport COST ESTIMATE � IT Corporation <br /> Aviation Fuel Farm June 28, 1996 <br /> TASK 2. Sail and Groundwater investigation <br /> A. Groundwater Grab Sampling <br /> IT Labor Item Units Rate Cost <br /> Staff Geologist 16 $6400 $1,024.00: <br /> Total Labor $1,024.00 <br /> Ovide Item Units Rate Cost <br /> Geoprobe Contractor 1 $1,500,00 $1,500,00 <br /> PIIS Rental 1 100.00 100.00 <br /> Vehicle Rental+Gas 1 50.00 50.00 <br /> Mark-up 1550 10% 165.00 <br /> Total Outside $1,815.00 <br /> SUBTOTAL $2,839.00 <br /> B. Monitoring Well Installations <br /> IT Labor Item Units Rate Goss <br /> Staff-Geologist 20 $64.00 $1,280.00 <br /> Total Labor $1,280.00 <br /> Outside Item Units Bate Cost <br /> Drilling Contractor , 1 $7,500.00 $7,500.00 <br /> PID Rental 2 100.00 200:00 <br /> Vehicle Rental+Gas 2 50`:00 100A0 <br /> Mise Expendable Supplies 7 20.00 20.00 <br /> Mark-up 7820 782.00 <br /> Total'i7utside $8,602,00 <br /> SUBTOTAL. $8,882.04 <br /> C. Laboratory Analyses <br /> Outside Item UnitsRate Cost <br /> Groundwato Grab Samples 3 $127.00 5381.Of} <br /> Soil Samilas. 18 127.00 2;288.04 <br /> Mark-: <br /> uP 2667 10°l4 <br /> .. .26870 <br /> Total Outside 52,533:70 <br /> SUBTOTAL. 52,033.70 <br /> 0. Well Development and Surveying <br /> IT Labor Itests UnitsRate Cost <br /> Teehrsiaian..... 8 $44.44 5352,00.: <br /> Total Labor $352,40' <br /> Outside Item:.. Units Etats cost <br /> W611.06. velopment Contractor 1 $1360.00 $1;350.00 <br /> Survi yor 1 600:00 .:$00.00 <br /> ViOlde Rental+Gas 1 50:40 50.00.: <br /> Mo' c...Expetiii ble Sappiies 1 24.00 20,00 <br /> itilark�u' 2020 10'% 202.00 <br /> Total Outside $2:222:170 <br /> "Equip Itam:: Units fate Cost.:. <br /> witer Matets 1 $30.00 ,13040 <br /> Total IT Equip $367E00 <br /> SUBTOTAL $2,604.00 <br />