Laserfiche WebLink
UNDERGROUND STORAGE TANK COMPLIANCE PLAT <br /> SAID JOAQUI COUNTY SITES <br /> 1 5000 South Airport Way, Stockton (multiple locations) <br /> 2. 6250 Lindberg Street, Stockton (Career Aviation Sales) <br /> 3. 1810 Hazelton; Stockton (Motor Pool) <br /> . 222 East Weber, Stockton (Courthouse) <br /> 24 North Hunter, Stockton (Canils Building) <br /> 130 forth Hunter, Stockton(Downtown Motor .Pool) <br /> 7 145 South Sutter, Stockton (County Administer's Office) <br /> S. 939 Mathews Road, Stockton (Government Building Site) <br /> 9. 503 East 10th Street, Tracy (Agricultural Co is ioner's Office) <br /> 10. 392 South Moffat, Manteca(Agricultural Commissioner's Office) <br /> MGUL:ATOR"Y` COMkIANCE PLAN <br /> To prepare the pian, the following tasks will be performed for each site: <br /> + Review all praject files available at the PISS-�E D: <br /> t Conduct a site visit to evaluate logistical constraints; <br /> Interview in-person or by telephone the assigned PHS-EHD.staff <br /> Based on the data collected during these tasks, the Regulatory Compliance Plan will include the fallowing <br /> information or each site. <br /> History of environmental corrective action at each site; <br /> Summary of site characteristics relevant to performing corrective actidti work(i.e,, mit <br /> type, depth-to-groundwater,groundwater gradient,concentrations 4cantarnz nts trt soil <br /> and groundwater, etc.) <br /> Site map showing location of USTs and existing and/or required soil and/or groundwater <br /> sample locations (Photographs will be included if relevant); . . <br /> +► Statement of the current site conditions causittg't out-of-cc �liance status; <br /> �r <br /> Scope of work required to achieve,regulatory compliance; <br /> .4 . . Estimated cost;to implement scope of work; <br /> ► <br /> Duration of tasks required to implement scope of wont: <br /> This information ftr each of the sites will be separated b tabs and bound into a one volune tato <br /> p y �` <br /> .6mphance Plan fir presentation to the County: <br /> I o'assist the Ctiurtty in its s rategy to fund and perform the compltance want, a long range."ftiatdirtg <br /> strategy will be retertxtrie i:: .'I1is:;strate pian will consider.. <br /> � <br /> .Priorities p tie PHS-EHE; <br /> i�' wd <br /> and regulataotis .: <br /> Access io and applicability of 119T Reimbursement Fund; <br /> + Available County funding and <br /> • Other strategic and funding considerations. <br /> . .... .........: <br /> ......:...... . . <br />