My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Both of the proposed nested wells will be constructed with screen intervals spanning from <br /> approximately 18 to 28 feet and y:;3. to 48 feet bgs: These screen intervals should enable the <br /> independent &Valuation of the up E, and lower vadose zone soils, without:interference from the <br /> burieid'concru s'ab. The yen intervals will be based on field observations during the <br /> mous c , of the ,p_.neo ail ;sparge well. The proposed single-casing$V15 well will be <br /> Constructed w a , i interval r Spanning from to 2 feet tags, to evalua#e thie rerrrediation of <br /> irnpt ct d soil rr tie Vicinity of : e three former t,g i -gallon USTs (Tanks 21, 22 and.2 ). <br /> t, <br /> FIter packs f 6. tere 03 graded and washed sand will be placed around`all of the screen <br /> intervals and aplaro.X.IM rely one-toot above the tops of the screen intervais, In the nested wells,. <br /> between the tiara of ate 46. f.sand packs and the bases of the upper wells (i.6., 28 to 32 feet <br /> b s), the drill�i wtll:irts tl fbur-4uat layers of;hydrated bentonite: The ille�r will also place two-foot <br /> t layers t i rdr` rd tntonite abbve the tops pf the upper sand packs in rile nested wells, and <br /> above the sand pal k irt;the single c irrg well. Overlying the upper bentonite layer In the well <br /> nests, and brve the ltorrit layer in the ding(e-casing well, the driller Will seal the wells witty <br /> neat cement grout: T61. Cilit future underground soil vapor'extraction piping connectians,the <br /> tops of the cement seals will be apprb imately two feet below surface grade w Each of the well <br /> casings will be seeured with w tertight locking caps,and all three wells will be protected with IS- <br /> inch dfarneter. traffilc-ratecl, flus"ount street boxes. <br /> C-57; € teres c z ter will install one, ane-inch diameter air sparge test iveii to a tot81 depth of <br /> approximately 63- 4 boa, using a trUck-njounted drill rig and 8-inch diameter hblloww stem angers. <br /> 'To evaluate the sort stratigraphy wi+hi f t= e former UST source area, tt .;, air sparge wrvell bon ng will. <br /> be cr�rttinu�ausly cored :`he location of the proposed air sparge well is shown ort Figure 2. <br /> The air spam ell will be cores#rude t r�tk� �� 3-foot rr�l opor pus bubbler(kWA s arge ointT } <br /> ,from approximately60 to 63 feet bs. The actual depth of the spargepoint will <br /> ort soil apes obsery ed wring drilling. Ideally,the spargepoint should be installed within <br /> a sandy interval tb ma intize air flow into the formation, <br /> Blank PUC casing will thread into the top of the spargepoint and extend to the surface. A filter <br /> pack'of l or terey#3 graded and washed sand will be placed within the annular space around the <br /> spargepoint and two feet above the tip of the spargepoint i.e , 58 feet bgs . Overlying the filter <br /> pack,b feet of hydrated bentonite will be placed within the annular space between the borehole <br /> and tete well casing. Over the hydrated bentonite, a surface seal of heat cement grout will be <br /> installed_ To facilitate future underground air sparge piping connections, the top of the upper <br /> cement seal will be approximately two feet below surface grade. The wellhead will be secured <br /> with a watertight locking cap arra a 12-inch diameter, traffic-rated, flush-mount street box. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.