My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:28:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Physical r ; These hazards e primarily s o i ted with onsite equipment and the <br /> general nam of construction work. Please refer to the attached Physical Hazard Analysis <br /> Sheets for controls. <br /> X Heat X Slip, Trip, Fall Excavations/Trenches <br /> Cold X cie Moving Equipment <br /> 7777 _.,.w...._.,_ <br /> Rain Underground HazardsTralc <br /> Fog 'Overhead Hazards Otho <br /> h, e Protection: <br /> C l <br /> ar <br /> N!"f7cations to levels ofprote tiara hall IN., ,,- SO aft-d <br /> aIr <br /> SItf lC��::�"@SCE' Ali" s.: " 1 * ' entered i1I19 W :� IX n <br /> 7.7 <br /> Site :ontr rrfto thori ed personnel wallnot be n1 c� ed h wcrriC NO <br /> 1 <br /> eating dry r str� ,)ling in the work area. The i°ield Supervisor shall en.fon*these meastm. . <br /> raid bdc* ,P111'and training requirementsfor all on site personnel. Spills are n <br /> expected tai be rncenn on the project. However, of a spill is to occur. adsorbentmaterw <br /> 4v <br /> tat gate, afet `- mil heli the SSQ'for all site personnel. T stuix' <br /> Wil nc lnd , `+tom to items in this Health and Sa 'ey,Fly;,the f►lt ;at : <br /> Ilk <br /> +� l l ill a rste groper lifting;sect" for.head iter . 'filue <br /> t` wet ht to be lifted Ivry any site personnel sl uld iib we d�%s. <br /> g, <br /> Ing shall be arrspected prig to oiler ttc r by drill <br /> • eel as an; rtte shall be secured around the work tea: <br /> l44e � uttsher, first aid kit, eye wwash, hopittall route <br /> eW $s dig drilling activities. <br /> lt+ CM shall contact the with any deal tih + issues. <br /> f 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.