Laserfiche WebLink
Physical Hazards- These hazards are primarily associated with onsite equipment and the <br />general nature of construction work IT personnel will follow all safety rules established in <br />IT's training program Please refer to the attached Physical Hazard Analysis Sheets for <br />controls <br />11 Level of Protection: 1 ❑ A 1 ❑ B I ❑ C 1 ■ D li <br />Modifications- Modifications to levels of protection shall be made by the SSO based on air <br />monitoring results in accordance with Table I <br />Site Entry Procedures The site will be entered from C E Dixon Street <br />' Site Control Measures. Unauthorized personnel will not be allowed in the work area No <br />eating, drinking or smoking in the work area The Field Supervisor shall enforce these <br />measures and buddy system, PPE and training requirements for all on site personnel Spills <br />are not expected to be a concern on the project However, if a spill is to occur, adsorbent <br />materials are available within the engineering and plant operations buildings on campus <br />' Personal Decontamination Procedures Wash hands and face prior to eating, drinking or <br />smoking and before leaving the site Remove contaminated clothing as soon as possible <br />' Equipment Decontamination Procedures: Steam cleaning of drilling equipment between <br />sample locations Decontamination by washing during well sampling activities <br />' Sanitation Facilities: Restrooms for both men and women are available within the main <br />terminal of the airport <br />Heat <br />X <br />Slip, Trip, Fail <br />Excavations/Trenches <br />X <br />Cold <br />X <br />Noise X <br />Moving Equipment <br />X <br />Rain <br />X <br />Underground Hazards X <br />Traffic <br />X <br />Fog <br />X <br />Overhead Hazards <br />Other <br />11 Level of Protection: 1 ❑ A 1 ❑ B I ❑ C 1 ■ D li <br />Modifications- Modifications to levels of protection shall be made by the SSO based on air <br />monitoring results in accordance with Table I <br />Site Entry Procedures The site will be entered from C E Dixon Street <br />' Site Control Measures. Unauthorized personnel will not be allowed in the work area No <br />eating, drinking or smoking in the work area The Field Supervisor shall enforce these <br />measures and buddy system, PPE and training requirements for all on site personnel Spills <br />are not expected to be a concern on the project However, if a spill is to occur, adsorbent <br />materials are available within the engineering and plant operations buildings on campus <br />' Personal Decontamination Procedures Wash hands and face prior to eating, drinking or <br />smoking and before leaving the site Remove contaminated clothing as soon as possible <br />' Equipment Decontamination Procedures: Steam cleaning of drilling equipment between <br />sample locations Decontamination by washing during well sampling activities <br />' Sanitation Facilities: Restrooms for both men and women are available within the main <br />terminal of the airport <br />