Laserfiche WebLink
Personal Protective Equipment: <br />X <br />Hard Hat <br />X <br />Safety Eyewear <br />X <br />Safety Toed Boots <br />X <br />Respirator (Type) Standby full -face APR <br />Shovel <br />Orange Vest <br />X <br />Filter Type Organic Vapor and HEPA <br />X <br />Hearing Protection <br />X <br />Gloves (Type) Latex or nitnle <br />X <br />Tyvek Coveralls (if needed) <br />Other <br />5 Minute Escape Respirator <br />Other Emergency/Safety Equipment: <br />X <br />15 Minute Eyewash <br />X <br />Fire Extinguisher <br />X Barricades <br />X <br />First Aid Kit <br />X <br />Shovel <br />Traffic Cones <br />■ Training All personnel on site will have completed a minimum of 40 hours of training, and <br />1p an 1 -hour refresher as required by 29 CFR 1910 120 and 8 CCR G1SO 5192 This includes <br />first aid/CPR, hearing conservation, respiratory protection, HWS training, Qualified <br />Equipment Operator (Geoprobe and Drill Rig), and Bloodborne Pathogen (BBP) <br />' Medical Surveillance Requirements- The IT Medical Surveillance Program (MSP) will at a <br />minimum meet the requirements of the OSHA regulation 29 CFR 1910 120 (f), medical <br />surveillance programs for hazardous waste operations and emergency response <br />' (29CFR1910 134 Respiratory Protection and 29CFRI910 95 Hearing Conservation) The IT <br />Health and Safety Officer will be responsible to ensure that the IT MSP is developed and <br />implemented <br />' Emergency Response Plan: IT's Emergency Response/Contingency Plan (Plan) is designed <br />to define and communicate procedures to be followed in case of an emergency The Plan is <br />consistent with the regulations under 29 CFR 1910 120 (1) (1) Due to the nature of this <br />work, it is not anticipated that a catastrophe (e g , explosion, fire, etc ) will occur However, <br />in case of an emergency, the SSO shall ensure that all personnel working at the site shall <br />know at a minimum the following evacuation procedures <br />' 1 If evacuation is necessary, all personnel will proceed to a predetermined location in the <br />support zone upwind and upslope (as necessary) of the work zone <br />5 <br />