Laserfiche WebLink
ii <br /> i <br /> I <br /> TABLE OF CONTENTS <br /> Section Title I Paye <br /> 1.0 INTRODUCTION i 1 <br /> 1.1 Background . . . . . . . . . . . . . . . . . . . <br /> 1 <br /> 1.2 Hydrology . . . . . . . . . . . . . . it 4 i <br /> i . . <br /> 2.0 PROPOSED SITE INVESTIGATIONS ACTIVIT <br /> � iES . . . . . . . . . . . 4 <br /> 2.1 General Requirements . . . . . . . . . i . . . . . . . . . . . . . . . . . . . 4 <br /> 2.2 Soil Borings . . . . . . . . . . . . . . . ii . . . . . . . . . . . . . . . . . . . 5 <br /> 2.3 Monitor Well Location and Installation 5 <br /> 2.4 Lithologic Description of Soil . . . . 1i. . . 6 f <br /> 2.5 Groundwater Sampling . . . . . . . . 11 . . . . . . . . . . . . . . . . . . . 6 <br /> 3.0 SAMPLING AND SAMPLE ANALYSIS PROCEDURES . . . . . . . . . 6 <br /> 3.1 General Requirements and Documentation . . . . . . .. . . . . . . 6 <br /> 3.2 Sampling Technique . . . . . . . . . . it . . . 7 <br /> 3.2.1 Soil Sample Screening and Selection . . . . . . . . . . . . . . . 7 <br /> 3.2.2 Monitor Well Groundwater Sampling . . . . . . . . . . . . . . 7 <br /> 3.3 Equipment Decontamination . . . . . 7 <br /> 3.4 Sample Storage and Shipping . . . . I! . . . . . . . . . . . . . . . . . . 7 <br /> 3.5 Sample Analysis . . . . . . . . . . . . .i . . . . . . . . . . . . . . . . . . 8 <br /> 3.6 Handling Soil Cuttings, Monitor Well (Purge Water, and <br /> Decontamination Rinsate . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.0 SITE HEALTH AND SAFETY . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 5.0 REPORTING . . . . . . . . . . . . . . . 9 <br /> 6.0 SCHEDULE . . . . . . . . . . . . . . . . 9 <br /> i' <br /> i <br /> LIST OF FIGURES t <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map with Proposed Boring and Monitor1 Well Locations <br /> w I <br /> LIST OF TABLES <br /> Table 1 Excavation Confirmation Sample Results <br /> Table 2 Analytical Methods i <br /> snctixrrsu1cMvca.we2 i 3 04=/94 <br /> :a <br />