My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
3500 - Local Oversight Program
>
PR0543382
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 11:20:35 AM
Creation date
10/24/2018 9:57:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543382
PE
3528
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work will be conducted by an analytical laboratory certified I y the State of California to conduct <br />{ the required analyses. <br /> .I <br /> 2.2 Soil Borings <br /> At the Tank 1 and 2 location, two soil borings will be installed in positions straddling the former <br /> remedial excavation area as shown on Figure 2. Each boring will be drilled to a maximum } <br /> depth of 60 feet or the current groundwater level. Soil samples will be collected at 5-foot <br /> intervals from each boring starting at 10 bgs. All samples will be screened using a <br /> photoionization detector (PID) or flame ionization detector,(FID) and.<. ::; p :_ rc <br /> ......... :........:.....:.... <br /> r bgrtg�t 14 endfl feet bgs aang with thepr3aryge sarnpt will be submitted for <br /> chemical analyses at WESTOWs Analytical laboratory in 'Stockton, California. Additional <br />' sampling procedural details are provided in Section 3.2.1. At the completion of the soil <br />{ sampling, each boring will be grouted from the bottom to the surface through the augers. All <br /> soil samples will be analyzed for TPH-D and BTEX. <br /> At Tank 3 and Tank 4 locations, one boring will be placed adjacent to where the extractable <br /> hydrocarbons were originally identified. Soil samples will be taken at approximately 8 and 16 <br /> feet below grade and analyzed for both TPH-G and TPH-U. Both analyses appear prudent as ' <br /> only gasoline fuels were stored in the tanks but former analyses taken at the time of the tank ` <br /> removal suggested the presence of diesel type componentsin the soils T <br /> Bosomal fpr 1rthi galreefeddrtronal sample; writed, fihose samples Al...... ........ .........�F�� a�aal� � � <br /> The boring will be extended to the saturation zone and a ane-time sample of groundwater will <br /> be taken with a Hydropunch tool. The samples obtained will be analyzed for BTEX, TPH-G <br /> and TPH-D. While there is no history of the presence of BTEX chemicals in the soils at Tank 3 i <br /> and Tank 4, the parameter is included to tie into the investigation'work being completed at the <br /> Tank I and 2 location. <br /> l <br /> 2.3 Monitor Well Location and Installation <br /> Three monitor wells will be installed in the locations shown on Figure 2. The locations of these } <br /> monitor wells are based on a groundwater flow direction interpreted from the SJCFCD map, } <br /> "Lines of Equal Elevation of Water in Wells, Spring 1993." One well is located upgradient and <br /> i two wells are located downgradient of the excavation area. <br /> i <br /> The monitor wells will be constructed by hollow stem auger drilling techniques with a 2-inch <br /> diameter PVC casing and a 20 foot screened section. It is estimated that the total depth of each <br />' well will be a maximum of 65 to 70 feet. The screen will be located to set the top of screen at <br /> least 3 feet above the saturated zone. A sand pack will bei emplaced throughout the screened <br /> interval and will extend at least 2 feet above the top of the screen. A bentonite seal will be <br /> placed above the sand and the annular space will be grouted!above the seal to the surface with <br /> F a five percent bentonite/cement grout. Each monitor well will be completed in a flush mount <br /> christie box equipped with a locking cap. After construction, each well will be developed by <br /> is bailing, surging, and swabbing until the water is relatively free of sediments. The well head top <br /> k <br /> 5 ; <br /> srKviPrstislcMvco.wPz <br /> oa,oar�a <br /> I ' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.