My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
3500 - Local Oversight Program
>
PR0543382
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 11:20:35 AM
Creation date
10/24/2018 9:57:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543382
PE
3528
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If <br /> 4.0 SITE HEALTH AND SAFETY <br /> All field work will be performed in accordance with an approved site specific WESTON Health <br /> and Safety Plan. An OVM or an HNu instrument will be used to monitor air quality in the work <br /> area. It is anticipated that the field work will be conducted in Level D personnel protection with <br /> the potential for upgrading to Level C should sustained above background levels of hydrocarbon <br /> vapors be detected with the air monitoring instrument. <br /> { <br /> 5.0 REPORTING <br /> Upon receipt of the analytical results, a report will be prepared summarizing field activities and <br /> presenting the results of the investigation work. Conclusions and recommendations as <br /> appropriate to the findings will be presented. Upon review!b SJCMVCD, the report will be <br /> Y P <br /> submitted to EHD for evaluation. <br /> 6.0 SCHEDULE <br /> I, <br /> j Upon approval of this work plan by the EHD, field mobilization will require up to two weeks. <br /> It is anticipated that approximately one week will be required to complete all field activities. I <br /> One week is necessary to allow the wells to stabilize and analytical results will be available <br /> approximately three weeks after sample collection. The final report will require a maximum of t <br /> two weeks for preparation and submittal to SJCMVCD. Allowing one week for review and <br /> revision, the estimated total elapsed time required to accomplish the project from receipt of <br /> authorization to proceed to submittal of the report to San Joaquin ,County EHD is ten weeks. <br /> 4 i ' <br /> P <br /> I� <br /> 1 <br /> �1 <br /> t <br /> i <br /> i <br /> ��S\SICMVCD.WP2 9 04=,94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.