Laserfiche WebLink
1 TABLE OF CONTENTS <br /> f <br /> 1 <br />� Section Title p� <br /> 1.0 INTRODUCTION 1 <br /> 1.1 Background 1 <br /> 1.2 Hydrology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> a 2.0 PROPOSED SITE INVESTIGATIONS ACTIVITIES . . . . . . . . . . . 4 <br /> 2.1 General Requirements . . . . . . . . . !; . . . . . . . . . . . . . . . . . . . 4 <br /> 2.2 Soil Borings . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . 5 <br /> 2.3 Monitor Well Location and Installatiori� . . . . . . . . . . . . . . . . . . 5 <br /> 2.4 Lithologic Description of Soil ''' 6 <br /> 2.5 Groundwater Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 3.0 SAMPLING AND SAMPLE ANALYSIS PROCEDURES . . . . . . . . . 6 <br />` 3.1 General Requirements and Documentation . . . . . . . . . . . . . . . . 6 <br /> 3.2 Sampling Technique . . . . . . . . . . 7 <br /> 3.2.1 Soil Sample Screening and Selection . . . . . . . . . . . . . . . 7 <br /> 3.2.2 Monitor Well Groundwater Sampling . . . . . . . . . . . . . . 7 <br /> 3.3 Equipment Decontamination . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.4 Sample Storage and Shipping . . . . . . . . . . . . . . . . . . 7 <br /> 3.5 Sample Analysis . . . . . . . . . . . . .1i. . . . . . . . . . . . . . . . . . . 8 <br /> 3.6 Handling Soil Cuttings, Monitor Well Purge .Water, and <br /> Decontamination Rinsate 8 <br /> 4.0 SITE HEALTH AND SAFETY . . . . . . .>`. . . . . . . . . . . . . . . . . . . 8 <br /> 5.0 REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 6.0 SCHEDULE . . . . . . . . . . . . . . . . . . i' . . . . . . . . . . . . . . . . . . 9 <br /> LIST OF FIGURES , <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map with Proposed Boring and Monitor Well Locations <br /> 3I <br /> E LIST OF TABLES <br /> Table 1 Excavation Confirmation Sample Results <br /> Table 2 Analytical Methods <br /> s7 cansWCMVC6.WP2 i 03/W94 <br />