My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
3500 - Local Oversight Program
>
PR0543382
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 11:20:35 AM
Creation date
10/24/2018 9:57:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543382
PE
3528
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j 5.0 REPORTING <br /> I � <br /> Upon receipt of the analytical results, a report will be prepared summarizing field activities and <br /> { presenting the results of the investigation work. Conclusions and recommendations as <br /> appropriate to the findings will be presented. Upon review by SJCMVCD, the report will be <br /> submitted to EHD for evaluation. !' <br /> 6.0 SCHEDITLE <br /> Upon approval of this work plan by the EHD, field mobilization will require up to two weeks. <br /> . It is anticipated that approximately one week will be required to complete all field activities. <br /> One week is necessary to allow the wells to stabilize and'I analytical results will be available <br /> approximately three weeks after sample collection. The final report will require a maximum of <br /> two weeks for preparation and submittal to SJCMVCD. Allowing one week for review and <br /> revision, the estimated total elapsed time required to accomplish the project from receipt of <br /> authorization to proceed to submittal of the report to San Joaquin County EHD is ten weeks. <br /> F <br /> f <br /> yr ' <br /> ,j <br /> .I <br /> STWV TS\SJCMVCD.%Vn 9 ORA/% <br />
The URL can be used to link to this page
Your browser does not support the video tag.